arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 1010.4110cs.DS
收藏

考虑流时间和最大跨度的能量有效多处理机调度

Energy-Efficient Multiprocessor Scheduling for Flow Time and Makespan

Hongyang Sun, Yuxiong He, Wen-Jing Hsu, Rui Fan

摘要:

我们考虑多处理器上的节能调度,其中每个处理器的速度可以单独缩放,并且处理器在以速度$s$运行时消耗功率$s^α$,对于$α>1$。对于一组具有时变并行度的并行作业,调度算法需要在任意时刻同时决定处理机的分配和处理机的速度。目标是最小化总能耗和一定的性能指标之和,在本文中包括总流程时间和完工时间。对于这两个目标,我们提出了瞬时并行千里眼(IP千里眼)算法,知道的瞬时并行的工作在任何时候,但不是他们的未来的特点,如剩余的并行度和工作。对于总流时间加能量,我们提出了一个$O(1)$竞争算法,这显着改善后,最有名的非透视算法,是第一个恒定的竞争结果多处理器的并行作业的速度缩放。在最大完工时间加能量的情况下,这是第一次在文献中,我们提出了一个$O(\ln^{1-1/α}P)$竞争算法,其中$P$是处理器的总数。我们证明了该算法是渐近最优的,通过提供一个匹配的下界。此外,我们还研究了总流时间加能量的非透视调度问题,提出了一种算法,该算法实现了对任意释放时间工件的$O(\ln P)$ -竞争和对相同释放时间工件的$O(\ln^{1/α}P)$ -竞争。最后,我们证明了一个$Ω(\ln^{1/α}P)$下界的竞争比的任何非透视算法,匹配的上限,我们的算法的工件具有相同的释放时间。

英文摘要:

We consider energy-efficient scheduling on multiprocessors, where the speed of each processor can be individually scaled, and a processor consumes power $s^α$ when running at speed $s$, for $α>1$. A scheduling algorithm needs to decide at any time both processor allocations and processor speeds for a set of parallel jobs with time-varying parallelism. The objective is to minimize the sum of the total energy consumption and certain performance metric, which in this paper includes total flow time and makespan. For both objectives, we present instantaneous parallelism clairvoyant (IP-clairvoyant) algorithms that are aware of the instantaneous parallelism of the jobs at any time but not their future characteristics, such as remaining parallelism and work. For total flow time plus energy, we present an $O(1)$-competitive algorithm, which significantly improves upon the best known non-clairvoyant algorithm and is the first constant competitive result on multiprocessor speed scaling for parallel jobs. In the case of makespan plus energy, which is considered for the first time in the literature, we present an $O(\ln^{1-1/α}P)$-competitive algorithm, where $P$ is the total number of processors. We show that this algorithm is asymptotically optimal by providing a matching lower bound. In addition, we also study non-clairvoyant scheduling for total flow time plus energy, and present an algorithm that achieves $O(\ln P)$-competitive for jobs with arbitrary release time and $O(\ln^{1/α}P)$-competitive for jobs with identical release time. Finally, we prove an $Ω(\ln^{1/α}P)$ lower bound on the competitive ratio of any non-clairvoyant algorithm, matching the upper bound of our algorithm for jobs with identical release time.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑