Online scheduling in identical machines with makespan minimization has been a well studied research problem in the literature. In online scheduling, the scheduler receives a list of jobs one by one and assigns each incoming job on the fly irrevocably to one of the machines before the arrival of the next job. In this paper, we study a variant of the online scheduling problem, where jobs are requested on the fly from k distinct sources. On simultaneous arrival of jobs from multiple sources, it is a non-trivial research challenge to ensure fairness in scheduling with respect to distinct sources, while optimizing the overall makespan of the schedule. We develop a novel Multi Lists Scheduling Model(MLS) and propose a 2-competitive deterministic online algorithm namely Largest Job on Least Loaded Machine(LJLLM) based on the MLS model to address the above mentioned research challenge.
We explore the machine-minimizing job scheduling problem, which has a rich history in the line of research, under an online setting. We consider systems with arbitrary job arrival times, arbitrary job deadlines, and unit job execution time. For this problem, we present a lower bound 2.09 on the competitive factor of \emph{any} online algorithms, followed by designing a 5.2-competitive online algorithm. We also point out a false claim made in an existing paper of Shi and Ye regarding a further restricted case of the considered problem. To the best of our knowledge, what we present is the first …
This paper presents a new algorithm based on integrating Genetic Algorithms and Tabu Search methods to solve the Job Shop Scheduling problem. The idea of the proposed algorithm is derived from Genetic Algorithms. Most of the scheduling problems require either exponential time or space to generate an optimal answer. Job Shop scheduling (JSS) is the general scheduling problem and it is a NP-complete problem, but it is difficult to find the optimal solution. This paper applies Genetic Algorithms and Tabu Search for Job Shop Scheduling problem and compares the results obtained by each. With the im…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of equal release times, we give efficient exact algorithms for various objective functions. For the case of unequal release times, we give efficient exact algorithms for minimizing makespan.
In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows such that the total cost among all the jobs is minimized. A polynomial-time algorithm with the running time not exceeding $O(n^2logn)$ to give a solution to this problem is introduced, where $n$ is the nu…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on identical and unrelated parallel processors. For identical processors, we present LP-based O(1)-approximation algorithms. For unrelated processors, the approximation ratio naturally depends on the maximum number of rounds of any job. Since the number of rounds per job in typical MapReduce algorithms is a small constant, our scheduling algorithms achieve a small…
We study the problem of scheduling equal-length jobs with release times and deadlines, where the objective is to maximize the number of completed jobs. Preemptions are not allowed. In Graham's notation, the problem is described as 1|r_j;p_j=p|\sum U_j. We give the following results: (1) We show that the often cited algorithm by Carlier from 1981 is not correct. (2) We give an algorithm for this problem with running time O(n^5).
Motivated by the current research in data centers and cloud computing, we study the problem of scheduling a set of two-stage jobs on multiple two-stage flowshops. A new formulation for configurations of such scheduling is proposed, which leads directly to improvements to the complexity of scheduling algorithms for the problem. Motivated by the observation that the costs of the two stages can be significantly different, we present deeper study on the structures of the problem that leads to a new approach to designing scheduling algorithms for the problem. With more thorough analysis, we show th…
We consider an online scheduling problem, motivated by the issues present at the joints of networks using ATM and TCP/IP. Namely, IP packets have to broken down to small ATM cells and sent out before their deadlines, but cells corresponding to different packets can be interwoven. More formally, we consider the online scheduling problem with preemptions, where each job j is revealed at release time r_j, has processing time p_j, deadline d_j and weight w_j. A preempted job can be resumed at any time. The goal is to maximize the total weight of all jobs completed on time. Our main result are as f…
We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decision-maker must provide a schedule. It is assumed that only the intervals to which the due-dates belong are known. The concept of maximum regret is used to define robust solution. A polynomial time algorithm is given for the case when weights of jobs are all equal. A mixed-integer linear programming formulation is provided for the general case, and computational experiments are re…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal schedule can be computed in polynomial time by solving a linear program with O(n^3) variables and constraints, followed by some substantial post-processing (where n is the number of jobs.) In this note we describe a simple linear program with only O(mn) variables and constraints. Our linear program produces directly the optimal schedule and does not require any…
We study the online preemptive scheduling of intervals and jobs (with restarts). Each interval or job has an arrival time, a deadline, a length and a weight. The objective is to maximize the total weight of completed intervals or jobs. While the deterministic case for intervals was settled a long time ago, the randomized case remains open. In this paper we first give a 2-competitive randomized algorithm for the case of equal length intervals. The algorithm is barely random in the sense that it randomly chooses between two deterministic algorithms at the beginning and then sticks with it therea…
Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with makespan, flow-time, which measures the length of time a job spends in a system before it completes, is arguably the most important metric to measure the performance of a scheduling algorithm. In recent years, there has been a remarkable progress in understanding flow-time based objective functions in diverse settings such as unrelated machines scheduling, bro…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation this problem is described as (1 | r_j;p_j=p;pmtn | sum w_j U_j). We provide an O(n^4)-time algorithm for this problem, improving the previous bound of O(n^{10}) by Baptiste.
A moldable job is a job that can be executed on an arbitrary number of processors, and whose processing time depends on the number of processors allotted to it. A moldable job is monotone if its work doesn't decrease for an increasing number of allotted processors. We consider the problem of scheduling monotone moldable jobs to minimize the makespan. We argue that for certain compact input encodings a polynomial algorithm has a running time polynomial in n and log(m), where n is the number of jobs and m is the number of machines. We describe how monotony of jobs can be used to counteract the i…
In online scheduling, jobs are available one by one and each job must be scheduled irrevocably before the availability of the next job. Semi-online scheduling is a relaxed variant of online scheduling, where an additional memory in terms of buffer or an Extra Piece of Information(EPI) is provided along with input data. The EPI may include one or more of the parameter(s) such as size of the largest job, total size of all jobs, arrival sequence of the jobs, optimum makespan value or range of job's processing time. A semi-online scheduling algorithm was first introduced in 1997 by Kellerer et al.…
This paper presents scheduling algorithms for procrastinators, where the speed that a procrastinator executes a job increases as the due date approaches. We give optimal off-line scheduling policies for linearly increasing speed functions. We then explain the computational/numerical issues involved in implementing this policy. We next explore the online setting, showing that there exist adversaries that force any online scheduling policy to miss due dates. This impossibility result motivates the problem of minimizing the maximum interval stretch of any job; the interval stretch of a job is the…
By executing jobs serially rather than in parallel, size-based scheduling policies can shorten time needed to complete jobs; however, major obstacles to their applicability are fairness guarantees and the fact that job sizes are rarely known exactly a-priori. Here, we introduce the Pri family of size-based scheduling policies; Pri simulates any reference scheduler and executes jobs in the order of their simulated completion: we show that these schedulers give strong fairness guarantees, since no job completes later in Pri than in the reference policy. In addition, we introduce PSBS, a practica…
We analyze the problem of job scheduling with preempting on weighted jobs that can have either linear or exponential penalties. We review relevant literature on the problem and create and describe a few online algorithms that perform competitively with the optimal scheduler. We first describe a na{\" i}ve algorithm, which yields a high competitive ratio ($Ω(\frac{M}{s_{\min}})$) with the optimal, then provide an algorithm that yields a lower competitive ratio ($4\sqrt{\frac{M}{s_{\min}}} + n\log{\frac{Mn}{s_{\min}}}$). Finally, we make a minor modification to our algorithm to yield an algorith…
We study size-based schedulers, and focus on the impact of inaccurate job size information on response time and fairness. Our intent is to revisit previous results, which allude to performance degradation for even small errors on job size estimates, thus limiting the applicability of size-based schedulers. We show that scheduling performance is tightly connected to workload characteristics: in the absence of large skew in the job size distribution, even extremely imprecise estimates suffice to outperform size-oblivious disciplines. Instead, when job sizes are heavily skewed, known size-based d…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines. This conflict constraint naturally arises in several practical applications and has recently received considerable attentions in the research community. In fact, the problem is typically NP-hard (even for approximation) and most of algorithmic results achieved so far have heavily relied on special structures of the underlying graph used to model the conflict-…
We study the fundamental problem of scheduling bidirectional traffic along a path composed of multiple segments. The main feature of the problem is that jobs traveling in the same direction can be scheduled in quick succession on a segment, while jobs in opposing directions cannot cross a segment at the same time. We show that this tradeoff makes the problem significantly harder than the related flow shop problem, by proving that it is NP-hard even for identical jobs. We complement this result with a PTAS for a single segment and non-identical jobs. If we allow some pairs of jobs traveling in …
Scheduling jobs with precedence constraints on a set of identical machines to minimize the total processing time (makespan) is a fundamental problem in combinatorial optimization. In practical settings such as cloud computing, jobs are often malleable, i.e., can be processed on multiple machines simultaneously. The instantaneous processing rate of a job is a non-decreasing function of the number of machines assigned to it (we call it the processing function). Previous research has focused on practically relevant concave processing functions, which obey the law of diminishing utility and genera…
We consider an online preemptive scheduling problem where jobs with deadlines arrive sporadically. A commitment requirement is imposed such that the scheduler has to either accept or decline a job immediately upon arrival. The scheduler's decision to accept an arriving job constitutes a contract with the customer; if the accepted job is not completed by its deadline as promised, the scheduler loses the value of the corresponding job and has to pay an additional penalty depending on the amount of unfinished workload. The objective of the online scheduler is to maximize the overall profit, i.e.,…
We introduce and study a general scheduling problem that we term the Packing Scheduling problem. In this problem, jobs can have different arrival times and sizes; a scheduler can process job $j$ at rate $x_j$, subject to arbitrary packing constraints over the set of rates ($\vec{x}$) of the outstanding jobs. The PSP framework captures a variety of scheduling problems, including the classical problems of unrelated machines scheduling, broadcast scheduling, and scheduling jobs of different parallelizability. It also captures scheduling constraints arising in diverse modern environments ranging f…
Generalizing many well-known and natural scheduling problems, scheduling with job-specific cost functions has gained a lot of attention recently. In this setting, each job incurs a cost depending on its completion time, given by a private cost function, and one seeks to schedule the jobs to minimize the total sum of these costs. The framework captures many important scheduling objectives such as weighted flow time or weighted tardiness. Still, the general case as well as the mentioned special cases are far from being very well understood yet, even for only one machine. Aiming for better genera…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time problem is to minimize the number of active steps, i.e., timesteps in which at least one job is scheduled. In this way, the active time models parallel scheduling when there is a fixed cost for turning the machine on at each discrete step. This paper presents a 9/5-approximation algorithm for a special case of the active-time scheduling problem in which job wind…
In the SCHED problem we are given a set of n jobs, together with their processing times and precedence constraints. The task is to order the jobs so that their total completion time is minimized. SCHED is a special case of the Traveling Repairman Problem with precedences. A natural dynamic programming algorithm solves both these problems in 2^n n^O(1) time, and whether there exists an algorithms solving SCHED in O(c^n) time for some constant c < 2 was an open problem posted in 2004 by Woeginger. In this paper we answer this question positively.
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related machines such that machine $i$ can execute up to $m_i$ jobs at a time. Each machine $i$ has an in-delay $ρ^{\mathrm{in}}_i$ and out-delay $ρ^{\mathrm{out}}_i$. Likewise, each job $v$ has an in-delay $ρ^{\mathrm{in}}_v$ and out-delay $ρ^{\mathrm{out}}_v$. In a schedule, job $v$ may be executed on machine $i$ at time $t$ if each predecessor $u$ of $v$ is completed on…
We consider several combinatorial optimization problems which combine the classic shop scheduling problems, namely open shop scheduling or job shop scheduling, and the shortest path problem. The objective of the obtained problem is to select a subset of jobs that forms a feasible solution of the shortest path problem, and to execute the selected jobs on the open (or job) shop machines to minimize the makespan. We show that these problems are NP-hard even if the number of machines is two, and cannot be approximated within a factor less than 2 if the number of machines is an input unless P=NP. W…
We study the online scheduling problem where the machines need to be calibrated before processing any jobs. To calibrate a machine, it will take $λ$ time steps as the activation time, and then the machine will remain calibrated status for $T$ time steps. The job can only be processed by the machine that is in calibrated status. Given a set of jobs arriving online, each of the jobs is characterized by a release time, a processing time, and a deadline. We assume that there is an infinite number of machines for usage. The objective is to minimize the total number of calibrations while feasibly sc…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches from processing jobs of one class to jobs of a different class. During such a setup, a machine cannot process jobs and the duration of a setup may depend on the machine as well as the class of the job to be processed next. For this problem, we study approximation algorithms for non-identical machines. We develop a polynomial-time approximation scheme for unifo…
This paper discussed some job scheduling algorithms for Hadoop platform, and proposed a jobs scheduling optimization algorithm based on Bayes Classification viewing the shortcoming of those algorithms which are used. The proposed algorithm can be summarized as follows. In the scheduling algorithm based on Bayes Classification, the jobs in job queue will be classified into bad job and good job by Bayes Classification, when JobTracker gets task request, it will select a good job from job queue, and select tasks from good job to allocate JobTracker, then the execution result will feedback to the …
This work introduces a natural variant of the online machine scheduling problem on unrelated machines, which we refer to as the favorite machine model. In this model, each job has a minimum processing time on a certain set of machines, called favorite machines, and some longer processing times on other machines. This type of costs (processing times) arise quite naturally in many practical problems. In the online version, jobs arrive one by one and must be allocated irrevocably upon each arrival without knowing the future jobs. We consider online algorithms for allocating jobs in order to minim…
This paper studies a generalized busy-time scheduling model on heterogeneous machines. The input to the model includes a set of jobs and a set of machine types. Each job has a size and a time interval during which it should be processed. Each job is to be placed on a machine for execution. Different types of machines have distinct capacities and cost rates. The total size of the jobs running on a machine must always be kept within the machine's capacity, giving rise to placement restrictions for jobs of various sizes among the machine types. Each machine used is charged according to the time d…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the total weight of on-time jobs. The problem is known to be strongly NP-hard in general. A polynomial-time algorithm for scheduling unit execution time jobs on two machines is proposed. The performance of a broad family of approximation algorithms for scheduling unit execution time jobs on more than two machines is analysed. For the case of arbitrary job processing…
In many traditional job scheduling settings, it is assumed that one knows the time it will take for a job to complete service. In such cases, strategies such as shortest job first can be used to improve performance in terms of measures such as the average time a job waits in the system. We consider the setting where the service time is not known, but is predicted by for example a machine learning algorithm. Our main result is the derivation, under natural assumptions, of formulae for the performance of several strategies for queueing systems that use predictions for service times in order to s…
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are subject to some kind of mutual exclusion constraints modeled by a bipartite incompatibility graph of degree $Δ$, where two incompatible jobs cannot be processed on the same machine. We show that the problem is NP-hard even if $s_1=s_2=s_3$. If, however, $Δ\leq 4$ and $s_1 \geq 12 s_2$, $s_2=s_3=s_4$, then the problem can be solved to optimality in time $O(n^{1…
Machine scheduling is a fundamental optimization problem in computer science. The task of scheduling a set of jobs on a given number of machines and minimizing the makespan is well studied and among other results, we know that EPTAS's for machine scheduling on identical machines exist. Das and Wiese initiated the research on a generalization of makespan minimization, that includes so called bag-constraints. In this variation of machine scheduling the given set of jobs is partitioned into subsets, so called bags. Given this partition a schedule is only considered feasible when on any machine th…
With multiple identical unit speed servers, the online problem of scheduling jobs that migrate between two phases, limitedly parallelizable or completely sequential, and choosing their respective speeds to minimize the total flow time is considered. In the limited parallelizable regime, allocating $k$ servers to a job, the speed extracted is $k^{1/α}, α>1$, a sub-linear, concave speedup function, while in the sequential phase, a job can be processed by at most one server with a maximum speed of unity. A LCFS based algorithm is proposed for scheduling jobs which always assigns equal speed to th…
This report contains the description of two novel job shop scheduling benchmarks that resemble instances of real scheduling problem as they appear in industry. In particular, the aim was to provide large-scale benchmarks (up to 1 million operations) to test the state-of-the-art scheduling solutions on problems that are closer to what occurs in a real industrial context. The first benchmark is an extension of the well known Taillard benchmark (1992), while the second is a collection of scheduling instances with a known-optimum solution.
We address the tactical fixed job scheduling problem with spread-time constraints. In such a problem, there are a fixed number of classes of machines and a fixed number of groups of jobs. Jobs of the same group can only be processed by machines of a given set of classes. All jobs have their fixed start and end times. Each machine is associated with a cost according to its machine class. Machines have spread-time constraints, with which each machine is only available for $L$ consecutive time units from the start time of the earliest job assigned to it. The objective is to minimize the total cos…
Motivated by mail delivery scheduling problems arising in Royal Mail, we study a generalization of the fundamental makespan scheduling P||Cmax problem which we call the bounded job start scheduling problem. Given a set of jobs, each specified by an integer processing time p_j, that have to be executed non-preemptively by a set of m parallel identical machines, the objective is to compute a minimum makespan schedule subject to an upper bound g<=m on the number of jobs that may simultaneously begin per unit of time. With perfect input knowledge, we show that Longest Processing Time First (LPT) a…
In this paper, the single machine scheduling problem with deteriorating jobs and learning effects are considered, which is shown in the previous research that the SDR method no longer provides an optimal solution for the problem. In order to solve the problem, a new exact algorithm is proposed. Various test problems are solved to evaluate the performance of the proposed heuristic algorithm using different measures. The results indicate that the algorithm can solve various test problems with small, medium and large sizes in a few seconds with an error around 1% where solving the test problems w…
The scheduling literature has traditionally focused on a single type of resource (e.g., computing nodes). However, scientific applications in modern High-Performance Computing (HPC) systems process large amounts of data, hence have diverse requirements on different types of resources (e.g., cores, cache, memory, I/O). All of these resources could potentially be exploited by the runtime scheduler to improve the application performance. In this paper, we study multi-resource scheduling to minimize the makespan of computational workflows comprised of parallel jobs subject to precedence constraint…
KAIST(韩国科学技术院);London School of Economics(伦敦政治经济学院)
We study a single-server scheduling problem for the objective of minimizing the expected cumulative holding cost incurred by jobs, where parameters defining stochastic job holding costs are unknown to the scheduler. We consider a general setting allowing for different job classes, where jobs of the same class have statistically identical holding costs and service times, with an arbitrary number of jobs across classes. In each time step, the server can process a job and observes random holding costs of the jobs that are yet to be completed. We consider a learning-based $cμ$ rule scheduling whic…
We describe in this paper a new method for building an efficient algorithm for scheduling jobs in a cluster. Jobs are considered as parallel tasks (PT) which can be scheduled on any number of processors. The main feature is to consider two criteria that are optimized together. These criteria are the makespan and the weighted minimal average completion time (minsum). They are chosen for their complementarity, to be able to represent both user-oriented objectives and system administrator objectives. We propose an algorithm based on a batch policy with increasing batch sizes, with a smart selecti…
It is well known that size-based scheduling policies, which take into account job size (i.e., the time it takes to run them), can perform very desirably in terms of both response time and fairness. Unfortunately, the requirement of knowing a priori the exact job size is a major obstacle which is frequently insurmountable in practice. Often, it is possible to get a coarse estimation of job size, but unfortunately analytical results with inexact job sizes are challenging to obtain, and simulation-based studies show that several size-based algorithm are severely impacted by job estimation errors.…
Inapproximability of Unique-Machine Precedence Scheduling for Unit-Length Jobs
Simons Institute for the Theory of Computing, and Departments of EECS & Mathematics, UC Berkeley(加州大学伯克利分校);Department of EECS, UC Berkeley(加州大学伯克利分校);Institute for Interdisciplinary Information Sciences, Tsinghua University(清华大学交叉信息研究院)
Online scheduling has been a well studied and challenging research problem over the last five decades since the pioneering work of Graham with immense practical significance in various applications such as interactive parallel processing, routing in communication networks, distributed data management, client-server communications, traffic management in transportation, industrial manufacturing and production. In this problem, a sequence of jobs is received one by one in order by the scheduler for scheduling over a number of machines. On arrival of a job, the scheduler assigns the job irrevocabl…
We consider the online problem of scheduling jobs on identical machines, where jobs have precedence constraints. We are interested in the demanding setting where the jobs sizes are not known up-front, but are revealed only upon completion (the non-clairvoyant setting). Such precedence-constrained scheduling problems routinely arise in map-reduce and large-scale optimization. In this paper, we make progress on this problem. For the objective of total weighted completion time, we give a constant-competitive algorithm. And for total weighted flow-time, we give an $O(1/ε^2)$-competitive algorithm …
Applications in data-parallel computing typically consist of multiple stages. In each stage, a set of intermediate parallel data flows (Coflow) is produced and transferred between servers to enable starting of next stage. While there has been much research on scheduling isolated coflows, the dependency between coflows in multi-stage jobs has been largely ignored. In this paper, we consider scheduling coflows of multi-stage jobs represented by general DAGs (Directed Acyclic Graphs) in a shared data center network, so as to minimize the total weighted completion time of jobs. This problem is sig…
Motivated by applications in grid computing and project management, we study multiprocessor scheduling in scenarios where there is uncertainty in the successful execution of jobs when assigned to processors. We consider the problem of multiprocessor scheduling under uncertainty, in which we are given n unit-time jobs and m machines, a directed acyclic graph C giving the dependencies among the jobs, and for every job j and machine i, the probability p_{ij} of the successful completion of job j when scheduled on machine i in any given particular step. The goal of the problem is to find a schedul…
We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints $|d_j-t_j|\leq λp_j$ and $|d_j-t_j|\leq p_j +σ$ and showed the problem to be NP-hard for any $λ>1$ and for any $σ\geq 2$. We complement their results by parameterized complexity studies: we show that, for any $λ>1$, the problem remains weakly NP-hard even for $m=2$ and strongly W[1]-hard parameterized by $m$. We present a pseudo-polynomial-time algorithm for…
We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly at their deadline. We are given $n$ jobs and $m$ machines. Each job has a deadline, a weight, and a processing time that may be different on each machine. The goal is find a schedule that maximized the total weight of jobs completed exactly at their deadline. Note that this uniquely defines a processing time interval for each job on each machine. Interval Sc…