arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 1810.07510cs.DS
收藏

带袋约束的机器排序问题的EPTAS

An EPTAS for machine scheduling with bag-constraints

Kilian Grage, Klaus Jansen, Kim Manuel Klein

摘要:

机器调度是计算机科学中的一个基本优化问题。调度一组工作在给定数量的机器和最小化的完工时间的任务是很好的研究和其他结果,我们知道,EPTAS的机器调度相同的机器存在。Das和Wiese发起了关于最小化完工时间的推广的研究,其中包括所谓的袋约束。在机器调度的这种变化中,给定的一组作业被划分成子集,即所谓的包。给定此分区,只有当在任何机器上每个包最多有一个作业时,调度才被认为是可行的。Das和Wiese证明了机器调度的这种变体允许PTAS。我们将改善这一结果,给出第一个EPTAS的机器调度问题与袋约束。我们实现这一结果,通过使用新的见解,这个问题和袋约束的限制。我们表明,为了获得近似解,我们可以放松袋约束,忽略一些限制。我们的EPTAS使用了一种新的实例转换,这将使我们能够为大多数行李调度彼此独立的大型和小型作业。我们还表明,它是足够的尊重袋约束只有在一个恒定数量的袋,调度大型作业时。有了这些意见,我们的算法将允许一些冲突时,计算时间表,我们展示了如何修复的时间表在多项式时间交换某些工作。

英文摘要:

Machine scheduling is a fundamental optimization problem in computer science. The task of scheduling a set of jobs on a given number of machines and minimizing the makespan is well studied and among other results, we know that EPTAS's for machine scheduling on identical machines exist. Das and Wiese initiated the research on a generalization of makespan minimization, that includes so called bag-constraints. In this variation of machine scheduling the given set of jobs is partitioned into subsets, so called bags. Given this partition a schedule is only considered feasible when on any machine there is at most one job from each bag. Das and Wiese showed that this variant of machine scheduling admits a PTAS. We will improve on this result by giving the first EPTAS for the machine scheduling problem with bag-constraints. We achieve this result by using new insights on this problem and restrictions given by the bag-constraints. We show that, to gain an approximate solution, we can relax the bag-constraints and ignore some of the restrictions. Our EPTAS uses a new instance transformation that will allow us to schedule large and small jobs independently of each other for a majority of bags. We also show that it is sufficient to respect the bag-constraint only among a constant number of bags, when scheduling large jobs. With these observations our algorithm will allow for some conflicts when computing a schedule and we show how to repair the schedule in polynomial-time by swapping certain jobs around.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑