区间约束工件非抢占调度的参数化复杂性观点:少机、小松弛和小松弛
A parameterized complexity view on non-preemptively scheduling interval-constrained jobs: few machines, small looseness, and small slack
摘要:
我们研究了$n$作业的非抢占式调度问题,每个作业$j$具有一个释放时间$t_j$,一个截止日期$d_j$,和一个处理时间$p_j$,在$m$并行相同的机器。Cieliebak等人(2004)考虑了两个约束$|d_j-t_j|\leq λp_j$和$|d_j-t_j|\leq p_j +σ$,并证明了对于任何$λ>1$和任何$σ\geq 2$,该问题都是NP难的。我们通过参数化复杂性研究补充了他们的结果:我们证明了对于任何$λ>1$,即使对于$m=2$,问题仍然是弱NP-困难的,并且由$m$参数化的问题仍然是强W[1]-困难的。我们提出了一个伪多项式时间算法恒定的$m$和$λ$和固定参数的易处理性结果的参数$m$结合$σ$。
英文摘要:
We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints $|d_j-t_j|\leq λp_j$ and $|d_j-t_j|\leq p_j +σ$ and showed the problem to be NP-hard for any $λ>1$ and for any $σ\geq 2$. We complement their results by parameterized complexity studies: we show that, for any $λ>1$, the problem remains weakly NP-hard even for $m=2$ and strongly W[1]-hard parameterized by $m$. We present a pseudo-polynomial-time algorithm for constant $m$ and $λ$ and a fixed-parameter tractability result for the parameter $m$ combined with $σ$.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。