具有二部不相容图的单位长度工件在四台均匀机上的排序
Scheduling of unit-length jobs with bipartite incompatibility graphs on four uniform machines
摘要:
本文研究了在4台速度分别为$s_1 \geq s_2 \geq s_3 \geq s_4,$的均匀机上调度$n$相同工件的问题。我们的目标是找到一个尽可能短的时间表。我们假设工作受到某种互斥约束建模的程度$Δ$,其中两个不兼容的工作不能在同一台机器上处理的二分不兼容图。证明了即使在$s_1=s_2=s_3$条件下,该问题也是NP难的.然而,如果$Δ\leq 4$和$s_1 \geq 12 s_2$,$s_2=s_3=s_4$,那么问题可以在时间上被解决为最优的$O(n^{1.5})$。相同的算法返回最多2倍最优值的解,条件是$s_1 \geq 2s_2$。最后,我们研究了$s_1 \geq s_2 \geq s_3=s_4$的情况,并给出了在所有情况下的$O(n^{1.5})$ -时间$32/15$ -近似算法。
英文摘要:
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are subject to some kind of mutual exclusion constraints modeled by a bipartite incompatibility graph of degree $Δ$, where two incompatible jobs cannot be processed on the same machine. We show that the problem is NP-hard even if $s_1=s_2=s_3$. If, however, $Δ\leq 4$ and $s_1 \geq 12 s_2$, $s_2=s_3=s_4$, then the problem can be solved to optimality in time $O(n^{1.5})$. The same algorithm returns a solution of value at most 2 times optimal provided that $s_1 \geq 2s_2$. Finally, we study the case $s_1 \geq s_2 \geq s_3=s_4$ and give an $O(n^{1.5})$-time $32/15$-approximation algorithm in all such situations.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。