基于部分时间序列的能量有效调度
Energy Efficient Scheduling via Partial Shutdown
摘要:
出于在数据中心节省能源的问题,我们定义了一个新的问题,称为“机器激活”问题的集合。我们引入的中心框架考虑了一组$m$机器(无关或相关),其中每个机器$i$具有$a_i$的{ \em激活成本}。还有一组需要执行的$n$作业,$p_{i,j}$是机器$i$上作业$j$的处理时间。我们假设有一个$A$的激活成本预算--我们希望{ \em select}要激活的机器的一个子集$S$,总成本为$a(S) \le A$,{ \em find}在$S$中的机器上为$n$作业制定一个调度,以最小化完工时间(或任何其他度量)。对于一般的无关机器激活问题,我们的主要结果是,如果存在一个具有完工时间$T$和激活成本$A$的调度,那么对于任意的$ε>0$,我们都可以得到一个具有完工时间$\makespanconstant T$和激活成本$\costconstant A$的调度.我们还考虑在广义分配问题的工作分配成本,并使用我们的框架,提供算法,最大限度地减少机器激活和分配成本的同时。此外,我们提出了一个贪婪的算法,它只适用于基本版本,并产生一个$2T$的最大完工时间和激活成本$A (1+\ln n)$。对于一致相关的并行机调度问题,我们开发了一个多项式时间近似方案,输出的时间表的属性,机器的子集的激活成本是最多$A$和最大完工时间是最多$(1+ε) T$的任何$ε>0$。
英文摘要:
Motivated by issues of saving energy in data centers we define a collection of new problems referred to as "machine activation" problems. The central framework we introduce considers a collection of $m$ machines (unrelated or related) with each machine $i$ having an {\em activation cost} of $a_i$. There is also a collection of $n$ jobs that need to be performed, and $p_{i,j}$ is the processing time of job $j$ on machine $i$. We assume that there is an activation cost budget of $A$ -- we would like to {\em select} a subset $S$ of the machines to activate with total cost $a(S) \le A$ and {\em find} a schedule for the $n$ jobs on the machines in $S$ minimizing the makespan (or any other metric). For the general unrelated machine activation problem, our main results are that if there is a schedule with makespan $T$ and activation cost $A$ then we can obtain a schedule with makespan $\makespanconstant T$ and activation cost $\costconstant A$, for any $ε>0$. We also consider assignment costs for jobs as in the generalized assignment problem, and using our framework, provide algorithms that minimize the machine activation and the assignment cost simultaneously. In addition, we present a greedy algorithm which only works for the basic version and yields a makespan of $2T$ and an activation cost $A (1+\ln n)$. For the uniformly related parallel machine scheduling problem, we develop a polynomial time approximation scheme that outputs a schedule with the property that the activation cost of the subset of machines is at most $A$ and the makespan is at most $(1+ε) T$ for any $ε>0$.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。