arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2201.04196cs.DS
收藏

A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint

Weitian Tong, Yao Xu, Huili Zhang

英文摘要:

As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and introduced by Chen et al. [3] recently. A set of two-stage jobs are selected and scheduled on parallel two-stage flowshops to achieve the maximum total profit while maintaining the given makespan constraint. We give a positive answer to an open question about its approximability proposed by Chen et al. [3]. More specifically, based on guessing strategies and rounding techniques for linear programs, we present a polynomial-time approximation scheme (PTAS) for the case when the number of flowshops is a fixed constant.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑