arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2109.12381cs.CGcs.DS
收藏

有界拉伸的连通协调运动规划

Connected Coordinated Motion Planning with Bounded Stretch

Sándor P. Fekete, Phillip Keldenich, Ramin Kosfeld, Christian Rieck, Christian Scheffer

AI总结:

本文研究大量相同机器人的连通协调运动规划,证明最小化时间跨度问题NP完全,并提出常数缩放与常数拉伸的近似算法,总时长最优达O(d)。

摘要:

我们考虑大量简单、相同机器人的连通协调运动规划问题:从给定的机器人起始网格配置出发,我们需要通过一系列并行的、无碰撞的机器人运动到达期望的目标配置,使得在所有整数时刻机器人集合诱导出一个连通的网格图。目标是最小化运动调度的时间跨度,即在最短时间内到达新配置。我们证明该问题是NP完全的,即使仅判断能否在时间跨度2内完成也是NP完全的,而能否在时间跨度1内完成则可以在多项式时间内检查。在算法方面,我们为两个基本参数建立了同时的常数因子近似,通过实现常数拉伸来实现常数缩放。缩放形状(通过将给定对象的所有维度乘以相同的乘法因子而得到)在先前关于自组装的开创性工作中已被考虑,通常具有无界或对数缩放因子;我们提供了适用于有界常数的一般化缩放因子的方法。此外,我们的算法实现了常数拉伸因子:如果从起始配置映射到目标配置需要最大曼哈顿距离$d$,那么我们的整个调度的总持续时间为$\mathcal{O}(d)$,这在常数因子内是最优的。

英文摘要:

We consider the problem of connected coordinated motion planning for a large collective of simple, identical robots: From a given start grid configuration of robots, we need to reach a desired target configuration via a sequence of parallel, collision-free robot motions, such that the set of robots induces a connected grid graph at all integer times. The objective is to minimize the makespan of the motion schedule, i.e., to reach the new configuration in a minimum amount of time. We show that this problem is NP-complete, even for deciding whether a makespan of 2 can be achieved, while it is possible to check in polynomial time whether a makespan of 1 can be achieved. On the algorithmic side, we establish simultaneous constant-factor approximation for two fundamental parameters, by achieving constant stretch for constant scale. Scaled shapes (which arise by increasing all dimensions of a given object by the same multiplicative factor) have been considered in previous seminal work on self-assembly, often with unbounded or logarithmic scale factors; we provide methods for a generalized scale factor, bounded by a constant. Moreover, our algorithm achieves a constant stretch factor: If mapping the start configuration to the target configuration requires a maximum Manhattan distance of $d$, then the total duration of our overall schedule is $\mathcal{O}(d)$, which is optimal up to constant factors.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑