arXiv 2207.01192physics.acc-ph
收藏

KEK 7 GeV电子/4 GeV正电子注入器直线加速器实现200,000小时运行

Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac

Kazuro Furukawa, Mitsuo Akemoto, Dai Arakawa, Yoshio Arakida, Yusei Bando, Hiroyasu Ego, Yoshinori Enomoto, Toshiyasu Higo, Hiroyuki Honma, Naoko Iida, Kazuhisa… 展开作者

Kazuro Furukawa, Mitsuo Akemoto, Dai Arakawa, Yoshio Arakida, Yusei Bando, Hiroyasu Ego, Yoshinori Enomoto, Toshiyasu Higo, Hiroyuki Honma, Naoko Iida, Kazuhisa Kakihara, Takuya Kamitani, Hiroaki Katagiri, Masato Kawamura, Shuji Matsumoto, Toshihiro Matsumoto, Hideki Matsushita, Katsuhiko Mikawa, Takako Miura, Fusashi Miyahara, Hiromitsu Nakajima, Takuya Natsui, Yujiro Ogawa, Satoshi Ohsawa, Yuichi Okayasu, Takao Oogoe, Muhammad Abdul Rehman, Itsuka Satake, Masanori Satoh, Yuji Seimiya, Tetsuo Shidara, Akihiro Shirakawa, Hirohiko Someya, Tsuyoshi Suwada, Madoka Tanaka, Di Wang, Yoshiharu Yano, Kazue Yokoyama, Mitsuhiro Yoshida, Takashi Yoshimoto, Rui Zhang, Xiangyu Zhou

AI总结:

本文回顾KEK电子/正电子注入器LINAC 39年发展与20万小时运行成就,概述其技术演进、震后恢复及对多学科实验的支撑。

摘要:

KEK电子正电子注入器直线加速器(LINAC)于1982年开始向光子工厂(Photon Factory,PF)光源进行注入运行。从那时起的39年间,它为多个项目提供服务,即TRISTAN、PF-AR、KEKB和SuperKEKB。截至2020年5月7日,其总运行时间累计达到20万小时。在前辈们的不懈努力之后,我们对这一成就深感自豪。该注入器LINAC于1978年开工建设,并于1982年以2.5 GeV电子束为PF投入调试运行。与此同时,还为TRISTAN对撞机项目建造了正电子发生器直线加速器。慢正电子设施也于1992年投入调试。在KEKB非对称能量对撞机项目于1998年以直接能量注入方式投入运行后,又开发了双束团加速和同时注入等技术。由于该LINAC的柔性结构设计在东日本大地震中过于脆弱,恢复工作耗时三年。此后,SuperKEKB项目的建设和调试继续推进,而向四个储存环同时进行顶夸克注入的工作对基本粒子物理学和光子科学均有贡献。

英文摘要:

KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.