GSI 1.4MeV/u强流重离子直线加速器的调试

Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi

W. Barth

摘要:

Wideroe型Unilac预剥离器直线加速器的拆卸于1999年初进行。必须获得SIS中最重元素的粒子数增加两个数量级以上。从那时起,新的高电流注入器(HSI)由H型整流器和DTL结构组成,用于双束操作,并成功调试。高电荷注入器(HLI)在此期间提供主直线加速器。同时完成射频发射器和射频结构的调节和运行。HSI调试策略包括在每个运输和加速段之后使用多功能诊断测试台进行束流调查。将讨论LEBT、超透镜、IH槽I和II以及剥离段之后的广泛调试测量结果(例如横向发射度、束流宽度、束流传输)。使用来自MUCIS离子源的40 Ar 1+束来填充直线加速器直到理论空间电荷极限。1999年11月开始进行例行作业。

英文摘要:

The disassembly of the Unilac prestripper linac of the Wideroe type took place at the beginning of 1999. An increase of more than two orders of magnitude in particle number for the most heavy elements in the SIS had to be gained. Since that time the new High Current Injector (HSI) consisting of H-type RFQ and DTL-structures for dual beam operation was installed and successfully commissioned. The High Charge Injector (HLI) supplied the main linac during that time. Simultaneously conditioning and running in of the rf-transmitters and rf-structures were done. The HSI commissioning strategy included beam investigation after each transport and acceleration section, using a versatile diagnostic test stand. Results of the extensive commissioning measurements (e.g. transverse emittance, bunch width, beam transmission) behind LEBT, RFQ, Super Lens, IH tank I and II and stripping section will be discussed. An 40Ar1+ beam coming from a MUCIS ion source was used to fill the linac up to the theoretical space charge limit. Routine operation started in November 1999.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑