Chapter 16 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.
Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi
Wideroe型Unilac预剥离器直线加速器的拆卸于1999年初进行。必须获得SIS中最重元素的粒子数增加两个数量级以上。从那时起,新的高电流注入器(HSI)由H型整流器和DTL结构组成,用于双束操作,并成功调试。高电荷注入器(HLI)在此期间提供主直线加速器。同时完成射频发射器和射频结构的调节和运行。HSI调试策略包括在每个运输和加速段之后使用多功能诊断测试台进行束流调查。将讨论LEBT、超透镜、IH槽I和II以及剥离段之后的广泛调试测量结果(例如横向发射度、束流宽度、束流传输)。使用来自MUCIS离子源的40 Ar 1+束来填充直线加速器直到理论空间电荷极限。1999年11月开始进行例行作业。
Design Studies and Commissioning Plans for PARS Experimental Program
PARS(Plasma Acceleration Research Station)是一个电子束驱动等离子体尾流场加速试验台,用于Daresbury实验室的VELA/CRAA装置。为了优化各种操作配置,2D数值研究进行了一系列参数,如聚束长度,半径,等离子体密度和定位的聚束相对于彼此的双束加速计划,通过使用VSIM。在本文中,一些这些数值研究和考虑测量方法。
Design, Installation, and Initial Commissioning of the MTA Beamline
一个新的实验区,旨在开发,测试和验证使用400兆电子伏费米实验室直线加速器质子束的μ子电离冷却设备已经完全安装,目前正在调试。最初,该区域用于MUCOOL研发计划的液氢吸收剂的低温测试,现在,用于吸收剂的高功率束流测试,存在磁场的高梯度射频腔(包括充气腔)和其他原型μ子冷却装置。为μ子设施开发的实验方案涉及收集、捕获和冷却大发射率、高强度μ子束--约10**13 μ子,因此该设备的最终测试需要完整的直线加速器束,即1.6 x 10**13 p/脉冲。为了支持μ子冷却设施,这条新的初级束线直接从直线加速器提取束流并将其传输到测试设施。MuCool设施的设计概念来自早期的提案,但需要进行修改以适应高强度束流,低温和冷却实验规模的增加。此外,提供精确线的不同操作模式结合了专门的部分并利用直线加速器束参数的测量。本文报告的MuCool光束线的技术细节,这两种模式。
High-precision Beam Optics Calculation of the HIAF-BRing Using Measured Fields
Sino-French Institute of Nuclear Engineering and Technology, Sun Yat-sen University(中山大学中法核工程与技术学院);Institute of Modern Physics, Chinese Academy of Sciences(中国科学院近代物理研究所);University of Chinese Academy of Sciences(中国科学院大学);Chinese Academy of Sciences Ion Medical Technology Co., Ltd(中国科学院离子医疗技术有限公司)