SuperKEKB第1阶段调试中的PDKEEPAAA控制
LLRF controls in SuperKEKB Phase-1 commissioning
摘要:
SuperKEKB(Phase-1)是一个7-GeV电子和4-GeV正电子束的非对称双环对撞机,从2月开始,已于2016年6月底成功完成第一次调试,并在两个环中实现了第一阶段所需的束流。本文总结了低水平射频(LLRF)控制问题在第一阶段调试期间的运行结果,包括系统调谐,耦合聚束不稳定性和聚束间隙瞬态效应。SuperKEKB的射频系统由两个环上的大约30个速调管站组成。新开发的LLRF控制系统应用于第一阶段30个台站中的9个台站。SuperKEKB的RF参考信号分配系统也已升级。这些新系统运作良好,并无出现严重问题,有助顺利进行启用工程。在KEKB操作中使用的旧的现有系统仍然在大多数台站中重复使用,它们也像KEKB操作中一样运行良好。
英文摘要:
First beam commissioning of SuperKEKB (Phase-1), which is an asymmetry double ring collider of 7-GeV electron and 4-GeV positron beams, which had started from February, has been successfully accomplished at the end of June 2016, and the desired beam current for Phase-1 was achieved in both rings. This paper summarize the operation results related to low level RF (LLRF) control issues during the Phase-1 commissioning, including the system tuning, the coupled bunch instability and the bunch gap transient effect. RF system of SuperKEKB consists of about thirty klystron stations in both rings. Newly developed LLRF control systems were applied to the nine stations among the thirty for Phase-1. The RF reference signal distribution system has been also upgraded for SuperKEKB. These new systems worked well without serious problem and they contributed to smooth progress of the commissioning. The old existing systems, which had been used in the KEKB operation, were still reused for the most stations, and they also worked as soundly as performed in the KEKB operation.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。