arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1803.08968physics.acc-ph
收藏

费米实验室Muon g-2和Mu2e项目的LLRF系统

LLRF system for the Fermilab Muon g-2 and Mu2e projects

P. Varghese, B. Chase

摘要:

Mu 2 e实验测量μ子到电子的转换率,Muon g-2实验测量μ子的磁矩。这两个实验都需要将53 MHz批次的8 GeV质子重新聚束成150 ns,2.5 MHz脉冲,用于提取到Muon g-2的g-2靶和Mu 2 e的具有以2.36 MHz运行的单个RF腔的输送环。用于两个实验的LLRF系统在SOC FPGA板中实现,该SOC FPGA板集成到VXI机箱中的现有53 MHz LLRF系统中。两个RF系统之间的严格定时要求、大频率差和非谐波关系为LLRF系统设计提供了独特的挑战,以实现脉冲之间的波束形成、传输和波束消光所需的相位对准规范。新的LLRF系统的设计,这两个项目的描述和Muon g-2实验的初始束调试测试的结果。

英文摘要:

The Mu2e experiment measures the conversion rate of muons into electrons and the Muon g-2 experiment measures the muon magnetic moment. Both experiments require 53 MHz batches of 8 GeV protons to be re-bunched into 150 ns, 2.5 MHz pulses for extraction to the g-2 target for Muon g-2 and to a delivery ring with a single RF cavity running at 2.36 MHz for Mu2e. The LLRF system for both experiments is implemented in a SOC FPGA board integrated into the existing 53 MHz LLRF system in a VXI crate. The tight timing requirements, the large frequency difference and the non-harmonic relationship between the two RF systems provide unique challenges to the LLRF system design to achieve the required phase alignment specifications for beam formation, transfers and beam extinction between pulses. The new LLRF system design for both projects is described and the results of the initial beam commissioning tests for the Muon g-2 experiment are presented.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑