arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1208.2018physics.acc-ph
收藏

Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab

M. W. McGee, J. Leibfritz, A. Martinez, Y. Pischalnikov, W. Schappert

英文摘要:

The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule #1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑