arXivDaily arXiv每日学术速递 周一至周五更新
arXiv周末暂无论文更新,休息一下吧,周末愉快~~
arXiv 0901.2228physics.ins-dethep-ex
收藏

Test Beam Requirements for the ILC Tracking and Vertex Detectors

Ingrid-Maria Gregor

英文摘要:

In this report the test beam requirements for the vertex detector and the tracking detector for ILC are discussed. It focuses on the infrastructure needs of the different subsystems. In the second part of this summary the ideas about future infrastructure above the immediate needs are summarised.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑