带分配成本的相同并行机调度问题的近似算法

Approximation algorithms for identical parallel machine scheduling with assignment costs

School of Mathematics and Statistics, Yunnan University(云南大学数学与统计学院)

Wei Li

AI总结:

研究带分配成本的相同并行机非抢占调度问题,提出多项式时间算法获多项式时间近似方案,还改进了字典序调度问题的性能保证。

摘要:

我们研究相同并行机上的非抢占式调度问题,其中将作业$j$分配到机器$M_i$会产生成本$c_{ij}=a_iw_j+b_j$。加工时间$p_j$与成本权重$w_j$相互独立,且机器数量是输入的一部分。对于每个固定的$\varepsilon\in(0,1]$以及存在最大完工时间不超过$T$的调度的每个截止期限$T$,我们给出一种多项式时间算法,该算法计算出的调度其最大完工时间不超过$(1+\varepsilon)T$,且总分配成本不超过截止期限$T$下的最小值。将该算法作为子例程,我们得到一种多项式时间近似方案,用于在总成本预算约束下最小化最大完工时间,且该方案的调度始终满足预算约束;这回答了成本$c_{ij}=l_ic_j$(其中$c_j$独立于$p_j$)的一个开放问题。对于字典序问题(即所有最小完工时间的调度中总分配成本最小的问题),我们在多项式时间内得到一个调度,其最大完工时间至多为最小值的$1+\varepsilon$倍,且总分配成本至多为字典序最优调度的总分配成本;这改进了早期针对加法成本和乘法成本的算法的完工时间保证。对于成本$c_{ij}=s_i+a_iw_j$(其中对在$M_i$上加工的每个作业收取$s_i$),在拟多项式时间内得到了相同的保证。

英文摘要:

We study non-preemptive scheduling on identical parallel machines in which assigning job $j$ to machine $M_i$ incurs the cost $c_{ij}=a_iw_j+b_j$. The processing times $p_j$ and the cost weights $w_j$ are independent, and the number of machines is part of the input. For every fixed $\varepsilon\in(0,1]$ and every deadline $T$ for which a schedule with makespan at most $T$ exists, we give a polynomial-time algorithm that computes a schedule with makespan at most $(1+\varepsilon)T$ whose total assignment cost does not exceed the minimum under the deadline $T$. Using this algorithm as a subroutine, we obtain a polynomial-time approximation scheme for minimizing the makespan under a total cost budget whose schedules always satisfy the budget; this answers an open question for costs $c_{ij}=l_ic_j$ with $c_j$ independent of $p_j$. For the lexicographic problem, in which the total assignment cost is minimized among all schedules of minimum makespan, we obtain in polynomial time a schedule with makespan at most $1+\varepsilon$ times the minimum and total assignment cost at most that of a lexicographically optimal schedule; this improves the makespan guarantees of earlier algorithms for additive and multiplicative costs. For costs $c_{ij}=s_i+a_iw_j$, where $s_i$ is charged for each job processed on $M_i$, the same guarantees are obtained in quasi-polynomial time.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑