arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2111.07244cs.DS
收藏

向量调度的一种简单近似算法及其在随机最小范数负载均衡中的应用

A Simple Approximation Algorithm for Vector Scheduling and Applications to Stochastic Min-Norm Load Balancing

Sharat Ibrahimpur, Chaitanya Swamy

摘要:

我们考虑相同机器上的向量调度问题:我们有m台机器,和n个工件的集合J,其中每个工件j有一个处理时间向量$p_j\in \mathbb{R}^d_{\geq 0}$。目标是找到一个分配$σ:J\to [m]$的工作机器,以尽量减少完工时间$\max_{i\in [m]}\max_{r\in [d]}( \sum_{j:σ(j)=i}p_{j,r})$。最优完工时间的自然下限是lb $:=\max\{\max_{j\in J,r\in [d]}p_{j,r},\max_{r\in [d]}(\sum_{j\in J}p_{j,r}/m)\}$。我们的主要结果是一个非常简单的O(log d)-近似算法向量调度的下界磅:我们设计了一个算法,返回一个分配的最大完工时间是O(log d)* 磅。作为一个应用程序,我们表明,上述保证导致O(log log m)-近似随机最小范数负载均衡(StochNormLB)。在StochNormLB中,我们有m台相同的机器,一组J的n个独立的随机作业,其处理时间是非负的随机变量,和一个单调的,对称的范数$f:\mathbb{R}^m \to \mathbb{R}_{\geq 0}$。我们的目标是找到一个分配$σ:J\to [m]$,最大限度地减少预期的$f$ -范数的诱导机器负载向量,其中机器i上的负载是(随机)总处理时间分配给它。我们的O(log log m)-近似保证实际上是更强:我们得到一个分配,同时是一个O(log log m)-近似StochNormLB与所有单调,对称规范。其次,该近似因子显著改善了O(log m/log log m)-近似值(Rumhimpur和Swamy,FOCS 2020),并且是我们提出的更一般的黑盒约简的结果,示出了关于下界Ib的d维向量调度的$γ(d)$近似产生了具有所有单调的StochNormLB的同时$γ(\log m)$近似,对称范数

英文摘要:

We consider the Vector Scheduling problem on identical machines: we have m machines, and a set J of n jobs, where each job j has a processing-time vector $p_j\in \mathbb{R}^d_{\geq 0}$. The goal is to find an assignment $σ:J\to [m]$ of jobs to machines so as to minimize the makespan $\max_{i\in [m]}\max_{r\in [d]}( \sum_{j:σ(j)=i}p_{j,r})$. A natural lower bound on the optimal makespan is lb $:=\max\{\max_{j\in J,r\in [d]}p_{j,r},\max_{r\in [d]}(\sum_{j\in J}p_{j,r}/m)\}$. Our main result is a very simple O(log d)-approximation algorithm for vector scheduling with respect to the lower bound lb: we devise an algorithm that returns an assignment whose makespan is at most O(log d)*lb. As an application, we show that the above guarantee leads to an O(log log m)-approximation for Stochastic Minimum-Norm Load Balancing (StochNormLB). In StochNormLB, we have m identical machines, a set J of n independent stochastic jobs whose processing times are nonnegative random variables, and a monotone, symmetric norm $f:\mathbb{R}^m \to \mathbb{R}_{\geq 0}$. The goal is to find an assignment $σ:J\to [m]$ that minimizes the expected $f$-norm of the induced machine-load vector, where the load on machine i is the (random) total processing time assigned to it. Our O(log log m)-approximation guarantee is in fact much stronger: we obtain an assignment that is simultaneously an O(log log m)-approximation for StochNormLB with all monotone, symmetric norms. Next, this approximation factor significantly improves upon the O(log m/log log m)-approximation in (Ibrahimpur and Swamy, FOCS 2020) for StochNormLB, and is a consequence of a more-general black-box reduction that we present, showing that a $γ(d)$-approximation for d-dimensional vector scheduling with respect to the lower bound lb yields a simultaneous $γ(\log m)$-approximation for StochNormLB with all monotone, symmetric norms.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑