High luminosity in DAFNE needs very high electron and positron currents stored. A full energy (510 MeV) injection system composed by a full energy electron and positron linac and an accumulator-damping ring is presently used. The electron and positron beams, alternatively accelerated by the linac, are injected and stacked in the accumulator with high efficiency thanks to its large acceptance and short damping time. The damped beams are extracted and transferred to the main ring through a long transfer line that has been built inside already existing buildings. The refill time of the collider is limited by the transfer line set-up change between the two different beams modes. In this paper a transfer line modification is proposed in order to reduce the switch time. A possible injection scheme for the main rings is also described.
The Frascati F-Factory DAFNE has been delivering luminosity to the KLOE, DEAR and FINUDA experiments since year 2000. Since April 2004 the KLOE run has been resumed and recently peak luminosity of 1.0x1032 cm-2s-1 and integrated luminosity of 6.2 pb-1/day have been achieved. The scientific program of the three high-energy experiments sharing DAFNE operation will be completed approximately by the end of year 2006. A scientific program for DAFNE beyond that date has not been defined yet and it is matter of discussion in the high-energy physics and accelerator physics communities. In this paper w…
This paper presents history and evolution of the intra-bunch feedback system for circular accelerators. This pro-ject has been presented by John D. Fox (SLAC/Stanford Un.) at the IPAC2010 held in Kyoto. The idea of the pro-posal is to build a flexible and powerful instrument to mit-igate the parasitic e-cloud effects on the proton (and poten-tially positron) beams in storage rings. Being a new and ambitious project, the financial issues have been quite im-portant. US LHC Accelerator Research Program (LARP) and other institution funding sources have assured the de-velopment of the design for im…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector accelerators, namely, the current 400 MeV LINAC and the Booster, are in progress under the Proton Improvement Plan (PIP). Proton Improvement Plan-II (PIP-II) proposes to replace the existing 400 MeV LINAC by a new 800 MeV LINAC, as an injector to the Booster which will increase Booster output power by nearly a factor of two from the PIP design value by the end of…
The challenging High Luminosity LHC (HL-LHC) beam requirements will lead in the future to unprecedented beam parameters along the LHC injector chain. In the SPS accelerator these requests translate into about a factor two higher intensity and brightness than the present design performance. In addition to the challenge of producing and accelerating such beams, these parameters affect the resistance of the existing equipment against beam impact. Most of the protection devices in the SPS ring, its transfer lines and the LHC injection areas will be put under operational constraints which are beyon…
An upgrade of the Recycler injection kicker system required a faster rise time pulser. This system required a field rise and fall time of < 57 ns and a field flattop of 1.6 μs. This paper describes the variety of improvements made over the years that have resulted in this latest thyratron pulser. The effects of the trigger, the reservoir and the load impedance on delay and rise time will be discussed.
We present an upgrade to the particle-in-cell ion beam simulation code OPAL that enables us to run highly realistic simulations of the spiral inflector system of a compact cyclotron. This upgrade includes a new geometry class and field solver that can handle the complicated boundary conditions posed by the electrode system in the central region of the cyclotron both in terms of particle termination, and calculation of self-fields. Results are benchmarked against the analytical solution of a coasting beam. As a practical example, the spiral inflector and the first revolution in a 1 MeV/amu test…
Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the next decade, the current 400 MeV normal conducting LINAC will be replaced by an 800 MeV superconducting LINAC (PIP-II) with an increased beam power >50% of the PIP design goal. Both in PIP and PIP-II era, the existing Booster is going to play a very significant role, at least for next two decades. In the meanwhile, we have recently developed an innovative bea…
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its primary goal to start providing 700 kW beam power on NOvA target by the end of 2017 and 2) the foreseen PIP-II will replace the existing LINAC, a 400 MeV injector to the Booster, by an 800 MeV superconducting LINAC by the middle of next decade, with output beam intensity from the Booster increased significantly and the beam power on the NOvA target increased…
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the design of a completely new injection system for the SPS using multi-level numerical optimisation, including realistic hardware assumptions. We also present how this hierarchical optimisation framework c…
During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the increased total intensity to nominal and ultimate luminosities a review of the impedance reduction techniques within the magnet was required. A number of new beam screen designs are proposed and their impedance evaluated. Heating estimates are also given with a particular attention paid to future int…
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the machine layout are also given. The technological challenges for the different equipment subsystems are detailed, and areas where R&D is necessary are highlighted.
This paper presents the modeling of time-structured multiturn injection for an upgraded Main Injector with the 8-GeV Superconducting RF proton driver, or an ILC-style linac, or a Project-X linac. The Radio-Frequency mismatch between a linac and the upgraded Main Injector will induce parasitic longitudinal painting in RF-phase direction. Several different scenarios with a choice of different RF parameters for single RF system and double RF system in the presence of longitudinal space charge have been investigated. From the studies of microbunch injection with the aid of ESME (2003) numerical si…
The upgrade of the Swiss Light Source, called SLS 2.0, is scheduled for 2023-24. The current storage ring will be replaced by one based on multi-bend achromats, allowing for about 30 times higher brightness. Due to the stronger focusing and the required chromatic compensation, finding a reasonably large dynamic aperture (DA) for injection, as well as an energy acceptance for a sufficient beam lifetime, is challenging. In order to maximize the DA and prolong the beam lifetime, we combine the well-known tracking code tracy with a massively parallel implementation of a multi-objective genetic alg…
At the Fermilab Booster, and many other proton facili-ties, an intense proton beam is accumulated by multi-turn injection of an H- beam through a stripping foil. The circu-lating beam scatters off the injection foil and large-angle Coulomb scattering leads to uncontrolled losses concen-trated in the first betatron period. We measure the foil scat-tering loss rate in the Fermilab Booster as a function of LINAC current, number of injection turns, and time on the injection foil. We find that current Booster operation has ~1% foil scattering loss and we make projections for the Proton Improvement …
Chapter 14 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the…
This technical report reviews the tests performed at the Best Cyclotron Systems, Inc. facility in regards to developing a cost effective ion source, beam line transport system, and acceleration system capable of high H$_2^+$ current output for the IsoDAR (Isotope Decay At Rest) experiment. We begin by outlining the requirements for the IsoDAR experiment then provide overview of the Versatile Ion Source, Low Energy Beam Transport system, spiral inflector, and cyclotron. The experimental measurements are then discussed and the results are compared with a thorough set of simulation studies. Of pa…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is going to be the source of issues. The booster accelerates beam from 400 MeV to 8 GeV and extracts to the Main Injector. Several percent of the beam is lost within 3 msec after the injection. The aperture at injection energy was measured and compared with the survey data. The magnets are going to be realigned in March 2012 in order to increase the aperture. …
The potentially realizable beam power at the Fermilab long-baseline neutrino program has motivated a reinvigorated design and optimization effort for a rapid-cycling synchrotron (RCS) intensity upgrade of the Fermilab proton complex. We examine areas of technological development with the potential for high-impact on the Fermilab RCS design - low-loss slip-stacking, advanced neutrino-target R\&D, laser-stripping H$^{-}$ injection, fast-ramping super-ferric magnets, nonlinear integrable optics, electron lens devices, and next-generation halo monitors. A brief overview is given on the Fermilab Ac…
The Advanced Photon Source is in the process of up-grading its storage ring from a double-bend to a multi-bend lattice as part of the APS Upgrade Project (APS-U). A swap-out injection scheme is planned for the APS-U to keep a constant beam current and to enable a small dynamic aperture. A novel concept that cancels out the effect of leakage field inside the stored beam chamber was introduced in the design of the septum magnet. As a result, the horizontal deflecting angle of the stored beam was reduced to below 1 micro-rad with a 2 mm septum thick-ness and 1.06T normal injection field. The conc…
The kicker control system was used for beam extraction and injection between two cooling storage rings (CSRs) at the Heavy Ion Research Facility in Lanzhou (HIRFL). To meet the requirements of special physics experiments, the kicker controller was upgraded. The new controller was designed based on ARM+DSP+FPGA technology and monolithic circuit architecture, which can achieve a precision time delay of 2.5 ns. In September 2014, the new kicker control system was installed in the kicker field, and the test experiment using the system was completed. In addition, a pre-trigger signal was provided b…
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limit…
A simulation package employing a Particle in Cell (PIC) method is developed to study the high current beam transport and the dynamics of plasmas. This package includes subroutines those are suited for various planned projects at University of Frankfurt. In the framework of the storage ring project (F8SR) the code was written to describe the beam optics in toroidal magnetic fields. It is used to design an injection system for a ring with closed magnetic field lines. The generalized numerical model, in Cartesian coordinates is used to describe the intense ion beam transport through the chopper s…
A laser-Compton backscattering beam, which we call a `Laser-Electron Photon' beam, was upgraded at the LEPS beamline of SPring-8. We accomplished the gains in backscattered photon beam intensities by factors of 1.5--1.8 with the injection of two adjacent laser beams or a higher power laser beam into the storage ring. The maximum energy of the photon beam was also extended from 2.4 GeV to 2.9 GeV with deep-ultraviolet lasers. The upgraded beams have been utilized for hadron photoproduction experiments at the LEPS beamline. Based on the developed methods, we plan the simultaneous injection of fo…
We report on the development of the HEC2 (High Energy Compression and Current) charge breeder, a possible high performance successor to REXEBIS at ISOLDE. The new breeder would match the performance of the HIE-ISOLDE linac upgrade and make full use of the possible installation of a storage ring at ISOLDE (the TSR@ISOLDE initiative [1]). Dictated by ion beam acceptance and capacity requirements, the breeder features a 2-3.5 A electron beam. In many cases very high charge states, including bare ions up to Z=70 and Li/Na-like up to Z=92 could be requested for experiments in the storage ring, ther…
Future high-power (10 - 20 MW) hadron accelerators offer many unique opportunities for fundamental science and nuclear applications. With the completion of Proton Power Upgrade (PPU) at 2.8 MW [1] and European Spallation Source (ESS) at 5 MW [2], the attention will be focused on the next high-power machine in hadron accelerator community. Charge exchange injection into a synchrotron using diamond stripper foils offers great advantage over direct proton acceleration. However, there are clear limitations associated with foil sublimation above critical beam power density and beam loss due to scat…