16.5 TeV HE-LHC的注入和卸载注意事项
Injection and dump considerations for a 16.5 TeV HE-LHC
摘要:
在当前的LHC隧道中,考虑了16.5TeV强子加速器的注入和束流倾倒,注入能量在1 - 1.3TeV范围内。本系统的描述和可能的升级方案调查更高的梁刚度。除了所需的设备性能外,还探讨了机器保护的相关方面。给出了机床布局的预期约束条件。详细介绍了不同设备子系统的技术挑战,并强调了需要进行研发的领域。
英文摘要:
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The present systems are described and the possible upgrade scenarios investigated for higher beam rigidity. In addition to the required equipment performance, the machine protection related aspects are explored. The expected constraints on the machine layout are also given. The technological challenges for the different equipment subsystems are detailed, and areas where R&D is necessary are highlighted.