440 GeV/c的高强度质子束对束流拦截装置的Mo和Cu涂层CfC/graphite和SiC/SiC吸收体的撞击

High intensity proton beam impact at 440 GeV/c on Mo and Cu coated CfC/graphite and SiC/SiC absorbers for beam intercepting devices

Jorge Maestre, Cristina Bahamonde, Inigo Lamas Garcia, Keith Kershaw, Nicolo Biancacci, Josep Busom, Matthias Frankl, Anton Lechner, Adnan Kurtulus, Shunsuke Ma… 展开作者

Jorge Maestre, Cristina Bahamonde, Inigo Lamas Garcia, Keith Kershaw, Nicolo Biancacci, Josep Busom, Matthias Frankl, Anton Lechner, Adnan Kurtulus, Shunsuke Makimura, Naofumi Nakazato, Ana Teresa Perez, Antonio Perillo-Marcone, Benoit Salvant, Regis Seidenbinder, Lorenzo Teofili, Marco Calviani

摘要:

束流拦截装置(BID)是大型强子对撞机(LHC)综合体运行的重要保护元件。LHC内部束流收集器(LHC Target Dump Injection或LHC TDI)是LHC注入系统的主要保护BID;其主要功能是在束流从SPS转移到LHC期间注入冲击磁铁发生故障的情况下保护LHC设备。TDI在LHC运行期间遇到了一些问题,其中大部分是由于电子云效应引起的核心部件的放气,这导致了注入器强度的限制,从而影响了LHC的可用性。TDI的吸收芯和一般的束流拦截装置的吸收芯需要处理由高强度粒子束引起的高热机械负载。此外,诸如TDI的设备-其中吸收材料安装在靠近束的位置,是加速器阻抗预算的重要贡献者。为了降低阻抗,构成芯的吸收材料通常必须涂覆有高导电性金属。涂层吸收体的光束冲击测试是开发工作的关键要素,以确保其正确运行。在欧洲核子研究中心的HiRadMat设施中,研究了几种金属涂层吸收材料暴露于高强度和高能量质子束时的行为。基于铜和钼的不同涂层配置,以及吸收材料,如等静压石墨,碳纤维复合材料(CfC)和碳化硅纤维增强碳化硅(SiC-SiC),在该设施中进行了测试,以评估TDI的性能,并为使用这些材料的其他BID提取信息。除了光束冲击试验和广泛的辐照后检查(PIE)活动,进行了广泛的数值模拟。

英文摘要:

Beam Intercepting Devices (BIDs) are essential protection elements for the operation of the Large Hadron Collider (LHC) complex. The LHC internal beam dump (LHC Target Dump Injection or LHC TDI) is the main protection BID of the LHC injection system; its main function is to protect LHC equipment in the event of a malfunction of the injection kicker magnets during beam transfer from the SPS to the LHC. Several issues with the TDI were encountered during LHC operation, most of them due to outgassing from its core components induced by electron cloud effects, which led to limitations of the injector intensity and hence had an impact on LHC availability. The absorbing cores of the TDIs, and of beam intercepting devices in general, need to deal with high thermo-mechanical loads induced by the high intensity particle beams. In addition, devices such as the TDI - where the absorbing materials are installed close to the beam, are important contributors to the accelerator impedance budget. To reduce impedance, the absorbing materials that make up the core must be typically coated with high electrical conductivity metals. Beam impact testing of the coated absorbers is a crucial element of development work to ensure their correct operation. The behaviour of several metal-coated absorber materials was investigated when exposed to high intensity and high energy proton beams in the HiRadMat facility at CERN. Different coating configurations based on copper and molybdenum, and absorbing materials such as isostatic graphite, Carbon Fibre Composite (CfC) and Silicon Carbide reinforced with Silicon Carbide fibres (SiC-SiC), were tested in the facility to assess the TDI's performance and to extract information for other BIDs using these materials. In addition to beam impact tests and an extensive Post Irradiation Examination (PIE) campaign, extensive numerical simulations were carried out.