CERN束流倾卸装置原型靶的束流冲击试验:试验装置和联机结果的初步分析

Beam impact tests of a prototype target for the Beam Dump Facility at CERN: experimental setup and preliminary analysis of the online results

E. Lopez Sola, M. Calviani, O. Aberle, C. Ahdida, P. Avigni, M. Battistin, L. Bianchi, S. Burger, J. Busom Descarrega, J. Canhoto Espadanal, E. Cano-Pleite, M. … 展开作者

E. Lopez Sola, M. Calviani, O. Aberle, C. Ahdida, P. Avigni, M. Battistin, L. Bianchi, S. Burger, J. Busom Descarrega, J. Canhoto Espadanal, E. Cano-Pleite, M. Casolino, M. A. Fraser, S. Gilardoni, S. Girod, J-L. Grenard, D. Grenier, M. Guinchard, C. Hessler, R. Jacobsson, M. Lamont, A. Ortega Rolo, M. Pandey, A. Perillo-Marcone, B. Riffaud, V. Vlachoudis, L. Zuccalli

摘要:

Beam Dump Facility(BDF)是欧洲核子研究中心(CERN)的一个新设施项目,致力于高强度束流收集和固定目标实验。目前在其设计阶段,该设施的首要目标是寻找光暗物质和隐藏部门模型与搜索隐藏粒子(SHiP)实验。该设施的核心是一个密集的目标/转储,其功能是安全地吸收400 GeV/c超级质子同步加速器(SPS)光束,并最大限度地生产魅力和美丽介子。300千瓦的平均功率将沉积在靶上,靶将在温度、结构载荷和辐照方面经受前所未有的条件。为了提供靶设计的代表性验证,在2018年期间,在SPS固定靶质子束下设计、制造和测试了原型靶,平均束流功率高达50 kW,相当于每脉冲350 kJ。目前的贡献详细的目标原型设计和实验装置,以及第一次评估的测量过程中进行的光束照射。对收集到的数据的分析表明,在原型测试期间实现了束流倾倒设施目标运行条件的代表性再现,这将在2020年期间通过辐照后检查活动进行补充。

英文摘要:

The Beam Dump Facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for Light Dark Matter and Hidden Sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400 GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the Beam Dump Facility target was achieved during the prototype tests, which will be complemented by a Post Irradiation Examination campaign during 2020.