CERN束流倾倒设施的高功率产生靶设计

Design of a high power production target for the Beam Dump Facility at CERN

E. Lopez Sola, M. Calviani, P. Avigni, M. Battistin, J. Busom Descarrega, J. Canhoto Espadanal, M. A. Fraser, S. Gilardoni, B. Goddard, D. Grenier, R. Jacobsson… 展开作者

E. Lopez Sola, M. Calviani, P. Avigni, M. Battistin, J. Busom Descarrega, J. Canhoto Espadanal, M. A. Fraser, S. Gilardoni, B. Goddard, D. Grenier, R. Jacobsson, K. Kershaw, M. Lamont, A. Perillo-Marcone, M. Pandey, B. Riffaud, S. Sgobba, V. Vlachoudis, L. Zuccalli

摘要:

Beam Dump Facility(BDF)项目是欧洲核子研究中心(CERN)提出的一个通用设施,专门用于束流收集和固定靶实验。在其初始阶段,该设施预计将用于搜索隐藏粒子(SHiP)实验。物理要求要求脉冲400 GeV/c质子束以及每年运行的最高可能的靶上质子数(POT),以寻找弱相互作用粒子。目标/转储组件位于设施的核心,目的是安全地吸收全部高强度的超级质子同步加速器(SPS)光束,同时最大限度地生产魅力和美容介子。靶/转储需要高Z材料,以便具有尽可能短的吸收体并减少下游实验的μ子背景。沉积在靶上的高平均功率(305 kW)对除热产生了挑战。在CERN于2016年启动的BDF设施综合设计研究(CDS)期间,进行了广泛的研究,以定义和评估目标组件设计。这些研究中所描述的目前的贡献,其中详细介绍了拟议的设计的BDF生产目标,以及材料的选择过程和优化的目标配置和光束稀释。这项工作的具体挑战和新颖性之一是需要考虑新的靶材料,如钼合金(TZM)作为芯吸收材料和Ta2.5W作为包层。热结构和流体动力学计算已被执行,以评估在束流操作下的目标及其冷却系统的可靠性。在目标总体设计的框架下,对整个目标组件进行了初步的机械设计,评估了整个目标系统的可行性。

英文摘要:

The Beam Dump Facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles (SHiP) experiment. Physics requirements call for a pulsed 400 GeV/c proton beam as well as the highest possible number of protons on target (POT) each year of operation, in order to search for feebly interacting particles. The target/dump assembly lies at the heart of the facility, with the aim of safely absorbing the full high intensity Super Proton Synchrotron (SPS) beam, while maximizing the production of charmed and beauty mesons. High-Z materials are required for the target/dump, in order to have the shortest possible absorber and reduce muon background for the downstream experiment. The high average power deposited on target (305 kW) creates a challenge for heat removal. During the BDF facility Comprehensive Design Study (CDS), launched by CERN in 2016, extensive studies have been carried out in order to define and assess the target assembly design. These studies are described in the present contribution, which details the proposed design of the BDF production target, as well as the material selection process and the optimization of the target configuration and beam dilution. One of the specific challenges and novelty of this work is the need to consider new target materials, such as a molybdenum alloy (TZM) as core absorbing material and Ta2.5W as cladding. Thermo-structural and fluid dynamics calculations have been performed to evaluate the reliability of the target and its cooling system under beam operation. In the framework of the target comprehensive design, a preliminary mechanical design of the full target assembly has also been carried out, assessing the feasibility of the whole target system.