arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1209.1979physics.ins-dethep-ex
收藏

CMS RPC系统在LHC首次长周期运行中的升级

The Upgrade of the CMS RPC System during the First LHC Long Shutdown

M. Tytgat, A. Marinov, P. Verwilligen, N. Zaganidis, A. Aleksandrov, V. Genchev, P. Iaydjiev, M. Rodozov, M. Shopova, G. Sultanov, Y. Assran, M. Abbrescia, C. C… 展开作者

M. Tytgat, A. Marinov, P. Verwilligen, N. Zaganidis, A. Aleksandrov, V. Genchev, P. Iaydjiev, M. Rodozov, M. Shopova, G. Sultanov, Y. Assran, M. Abbrescia, C. Calabria, A. Colaleo, G. Iaselli, F. Loddo, M. Maggi, G. Pugliese, L. Benussi, S. Bianco, M. Caponero, S. Colafranceschi, F. Felli, D. Piccolo, G. Saviano, C. Carrillo, U. Berzano, M. Gabusi, P. Vitulo, M. Kang, K. S. Lee, S. K. Park, S. Shin, A. Sharma

摘要:

CMS μ子系统包括在筒和端盖区域中的电阻板室(RPC)。它们主要用作触发探测器,也改善了μ子参数的重建。多年来,大型强子对撞机的瞬时光度逐渐增加。在LHC第一阶段(运行的前10年),在14 TeV的能量下,最终的光度预计将超过其设计值10^34/cm^2/s。为了准备这台机器以及为此进行的实验,计划在2013-2014年和2018-2019年进行两次长时间的停机。CMS协作计划在这些长期关闭期间进行几次检测器升级。特别是,μ子探测系统应该能够在高粒子速率下维持有效的1级μ子触发器的低pT阈值。确保这一点的措施之一是在两个端盖区域中添加第四层来扩展当前RPC系统。在第一次长时间停堆期间,这两个新站将在|eta| <1.6的区域配备144个高压层压板(HPL)双间隙RPC,以雪崩模式运行,其设计与现有CMS端盖室相似。在这里,我们提出了CMS RPC系统的第一次长时间停堆的升级计划,包括扩展系统的触发模拟研究,以及新的HPL生产,腔室组装和质量控制程序的细节。

英文摘要:

The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of the Large Hadron Collider gradually increases. During the LHC Phase 1 (~first 10 years of operation) an ultimate luminosity is expected above its design value of 10^34/cm^2/s at 14 TeV. To prepare the machine and also the experiments for this, two long shutdown periods are scheduled for 2013-2014 and 2018-2019. The CMS Collaboration is planning several detector upgrades during these long shutdowns. In particular, the muon detection system should be able to maintain a low-pT threshold for an efficient Level-1 Muon Trigger at high particle rates. One of the measures to ensure this, is to extend the present RPC system with the addition of a 4th layer in both endcap regions. During the first long shutdown, these two new stations will be equipped in the region |eta|<1.6 with 144 High Pressure Laminate (HPL) double-gap RPCs operating in avalanche mode, with a similar design as the existing CMS endcap chambers. Here, we present the upgrade plans for the CMS RPC system for the fist long shutdown, including trigger simulation studies for the extended system, and details on the new HPL production, the chamber assembly and the quality control procedures.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑