CMS RPC在LHC LS-2期间的活动

CMS RPC Activities During LHC LS-2

Mehar Ali Shah

摘要:

第二次LHC长停堆期(LS 2)是CMS电阻板室(RPC)完成巩固和升级项目的重要机会。整合包括气密性、HV(高压)、LV(低压)和慢速控制操作的检测器维护。RPC第2阶段升级的所有服务,即RE 3/1和RE 4/1,预计将安装到LS 2。本文总结了RPC系统的维护和升级活动。

英文摘要:

The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade, namely RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.