arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv quant-ph/0008014quant-ph
收藏

早期的隧道工程

Early times in tunneling

Gaston Garcia-Calderon, Jorge Villavicencio

摘要:

利用含时薛定谔方程的精确解析解,以截止波入射为初始条件,研究了隧道穿越时间。概率密度开始于沿着电势的隧穿和透射区域的消失值。在势垒宽度处,它在早期表现出通常具有峰值$τ_p$和宽度$Δτ$的穿越时间分布。其他隧穿时间的数值结果,如相位延迟时间,落在$Δτ$。Büttiker遍历时间最接近$τ_p$。如果忽略其噪声行为,我们的结果类似于基于费曼路径的计算。

英文摘要:

Exact analytical solutions of the time-dependent Schrödinger equation with the initial condition of an incident cutoff wave are used to investigate the traversal time for tunneling. The probability density starts from a vanishing value along the tunneling and transmitted regions of the potential. At the barrier width it exhibits, at early times, a distribution of traversal times that typically has a peak $τ_p$ and a width $Δτ$. Numerical results for other tunneling times, as the phase-delay time, fall within $Δτ$. The Büttiker traversal time is the closest to $τ_p$. Our results resemble calculations based on Feynman paths if its noisy behaviour is ignored.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑