arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2310.01395cs.SE
收藏

需求特征:在系统工程背景下它们如何影响项目预算?

Requirements' Characteristics: How do they Impact on Project Budget in a Systems Engineering Context?

Panagiota Chatzipetrou, Michael Unterkalmsteiner, Tony Gorschek

AI总结:

本文联合瑞典交通局开展实地研究,利用CMR、RAM和SHM分类自然语言需求并结合统计与对应分析,揭示软硬件需求对变更成本和预算的不同影响。

摘要:

背景:需求工程在启动新项目时具有首要重要性。然而,单个项目涉及的需求数量可能多达数千条。在这样的数量下,控制并保证自然语言需求(NLR)的质量颇具挑战性。目的:在一项实地研究中,我们与瑞典交通局(STA)合作,调查需求特征在多大程度上影响项目中的变更请求和预算变化。方法:我们选择以下模型来刻画以自然语言表述的系统需求:基于关注点的需求模型(CMR)、需求抽象模型(RAM)和软件-硬件模型(SHM)。NLR的分类由三位作者完成。我们采用稳健的统计度量Fleiss’ Kappa来验证结果的可靠性。我们使用了描述性统计、列联表、卡方关联性检验结果以及事后检验。最后,使用多元统计技术对应分析,以便以二维图形形式展示一组需求。结果:结果表明,软件需求相比硬件需求关联的预算成本更低。此外,软件需求往往在更长时间内保持开放状态,这表明它们“更难”处理。最后,围绕变更请求进行更多讨论或互动可以降低实际估算的变更请求成本。结论:这些结果使我们认识到,有必要进一步调查软件需求与硬件需求被区别对待的原因,访谈项目经理,更好地理解这些需求的表述方式,并提出有效的软件管理方法。

英文摘要:

Background: Requirements engineering is of a principal importance when starting a new project. However, the number of the requirements involved in a single project can reach up to thousands. Controlling and assuring the quality of natural language requirements (NLRs), in these quantities, is challenging. Aims: In a field study, we investigated with the Swedish Transportation Agency (STA) to what extent the characteristics of requirements had an influence on change requests and budget changes in the project. Method: We choose the following models to characterize system requirements formulated in natural language: Concern-based Model of Requirements (CMR), Requirements Abstractions Model (RAM) and Software-Hardware model (SHM). The classification of the NLRs was conducted by the three authors. The robust statistical measure Fleiss' Kappa was used to verify the reliability of the results. We used descriptive statistics, contingency tables, results from the Chi-Square test of association along with post hoc tests. Finally, a multivariate statistical technique, Correspondence analysis was used in order to provide a means of displaying a set of requirements in two-dimensional graphical form. Results: The results showed that software requirements are associated with less budget cost than hardware requirements. Moreover, software requirements tend to stay open for a longer period indicating that they are "harder" to handle. Finally, the more discussion or interaction on a change request can lower the actual estimated change request cost. Conclusions: The results lead us to a need to further investigate the reasons why the software requirements are treated differently from the hardware requirements, interview the project managers, understand better the way those requirements are formulated and propose effective ways of Software management.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑