Negative hydrogen ions are often used for injecting protons from linacs to storage rings via charge-exchange injection. In this process, the two electrons are stripped by a foil or laser to produce protons which can be merged with an existing beam without significantly affecting its dynamics, allowing high intensities of protons to be accumulated. However, this capability comes with the drawback that the outer electron of an H$^-$ ion has a low binding energy and can easily be stripped away prior to injection. This paper addresses the following stripping mechanisms: interactions with residual gas in the beam pipe, blackbody radiation from accelerator components, and electromagnetic fields from accelerator optics (Lorentz-force stripping) and particles within the bunch itself (intrabeam stripping); with a discussion on how to avoid excessive activation from stripped H$^0$ particles and protons. We also demonstrate that the proportion of stripped H$^0$ colliding with a nearby beam pipe or machine-element walls presents only roughly 10\% of those lost in stripping; the remaining stripped particles traverse to the end of a linac or local straight section, which may relax the limits for allowable stripping-based beam loss in H$^-$ accelerators.
在ATLAS加速器上进行了多电荷态铀束加速试验。238 U +26束在ATLAS PII直线加速器中加速到286 MeV(~1.2 MeV/u),并在距离ATLAS助推器部分入口0.5 m处的碳箔中剥离。来自串列注入器的58 Ni 9+“引导”束被用来调整238 U +38的助推器。来自剥离的所有电荷状态被注入助推器并加速。高达94%的束流通过助推器直线加速器加速,损失主要在较低的电荷状态。本文报道了每个电荷状态的测量光束特性和数值模拟的比较。
Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi
Wideroe型Unilac预剥离器直线加速器的拆卸于1999年初进行。必须获得SIS中最重元素的粒子数增加两个数量级以上。从那时起,新的高电流注入器(HSI)由H型整流器和DTL结构组成,用于双束操作,并成功调试。高电荷注入器(HLI)在此期间提供主直线加速器。同时完成射频发射器和射频结构的调节和运行。HSI调试策略包括在每个运输和加速段之后使用多功能诊断测试台进行束流调查。将讨论LEBT、超透镜、IH槽I和II以及剥离段之后的广泛调试测量结果(例如横向发射度、束流宽度、束流传输)。使用来自MUCIS离子源的40 Ar 1+束来填充直线加速器直到理论空间电荷极限。1999年11月开始进行例行作业。