Energy system modellers typically choose a low spatial resolution for their models based on administrative boundaries such as countries, which eases data collection and reduces computation times. However, a low spatial resolution can lead to sub-optimal investment decisions for wind and solar generation. Ignoring power grid bottlenecks within regions tends to underestimate system costs, while combining locations with different wind and solar capacity factors in the same resource class tends to overestimate costs. We investigate these two competing effects in a capacity expansion model for Europe's power system with a high share of renewables, taking advantage of newly-available high-resolution datasets as well as computational advances. We vary the number of nodes, interpolating between a 37-node model based on country and synchronous zone boundaries, and a 1024-node model based on the location of electricity substations. If we focus on the effect of renewable resource resolution and ignore network restrictions, we find that a higher resolution allows the optimal solution to concentrate wind and solar capacity at sites with better capacity factors and thus reduces system costs by up to 10% compared to a low resolution model. This results in a big swing from offshore to onshore wind investment. However, if we introduce grid bottlenecks by raising the network resolution, costs increase by up to 23% as generation has to be sourced more locally at sites with worse capacity factors. These effects are most pronounced in scenarios where grid expansion is limited, for example, by low local acceptance. We show that allowing grid expansion mitigates some of the effects of the low grid resolution, and lowers overall costs by around 16%.
The electricity system value of the local acceptance of onshore wind in Europe
UCL Energy Institute, University College London(伦敦大学学院能源研究所);Department of Technology Systems, University of Oslo(奥斯陆大学技术系统系);Kelso Institute Europe(凯尔索欧洲研究所);Chair of Energy System Analysis, ETH Zurich(苏黎世联邦理工学院能源系统分析讲席);Biodiversity, Ecology, and Conservation Research Group, International Institute for Applied Systems Analysis(国际应用系统分析研究所生物多样性、生态与保护研究组);Department of Wind and Energy Systems, Technical University of Denmark(丹麦理工大学风能与能源系统系);Iceland School of Energy, Reykjavik University(雷克雅未克大学冰岛能源学院);Laboratory for Energy Systems Analysis, PSI Centers for Nuclear Engineering and Sciences & Energy and Environmental Sciences, Paul Scherrer Institute(保罗谢尔研究所能源系统分析实验室);Institute of Sustainable Economic Development, University of Natural Resources and Life Sciences, Vienna(维也纳自然与应用科学大学生态经济发展研究所);Copernicus Institute of Sustainable Development, Utrecht University(乌得勒支大学哥白尼可持续发展研究所)
Features of a fully renewable US electricity system: Optimized mixes of wind and solar PV and transmission grid extensions
根据32年的天气数据(时间分辨率为1小时,空间分辨率为40x40 km $^2$)计算了整个美国邻近地区的风能和太阳能光伏发电数据,并假设全国各地的风能和太阳能光伏发电容量分布是基于场地适用性的随机分布。这些数据用于研究完全可再生的电力系统,主要依靠风能和太阳能光伏发电。我们发现,由于美国夏季负荷高峰,风能和太阳能光伏的季节性最佳组合约为80%的太阳能光伏份额。通过选择这种组合,长期存储需求可以减少一半以上相比,风只混合。由于太阳能光伏发电的夜间间隙,每日最佳组合约为80%的风能份额。选择这种组合而不是太阳能只能减少约50%的备用能源需求。此外,我们计算了FERC(联邦能源管理委员会)水平的LCOE(电力平准化成本)的变化,因为它们的资源质量和波动模式不同。由于地区条件的不同,LCOE的差异高达35%,LCOE的最佳组合在很大程度上取决于资源质量。基于一种新的最小成本优化方法,构建了一个FERC区域之间的传输网络增强,以传输跨FERC边界的太阳能和风能的高穿透率。
Onshore, offshore or in-turbine electrolysis? Techno-economic overview of alternative integration designs for green hydrogen production into Offshore Wind Power Hubs
An autopilot for energy models -- automatic generation of renewable supply curves, hourly capacity factors and hourly synthetic electricity demand for arbitrary world regions
能源系统模型正越来越多地用于探索可变可再生能源占很大份额的情景。这需要高空间和时间分辨率的输入数据,并给建模团队带来相当大的预处理负担。在这里,我们提出了一个新的代码集与开源许可证的自动生成输入数据的大规模能源系统模型的任意区域的世界,包括国家以下地区,以及相关的通用容量扩展模型的电力系统。我们使用ECMWF ERA 5全球再分析数据以及其他公共地理空间数据集,为太阳能光伏发电、聚光太阳能发电、陆上和海上风电以及现有和未来的水电生成详细的供应曲线和小时容量系数。此外,我们使用机器学习方法来生成描述当前需求的合成小时电力需求序列,并使用区域SSP场景将其扩展到未来几年。最后,我们的代码集自动生成相邻地区之间HVDC互连的成本和损耗。我们的方法的有用性证明了几个不同的案例研究的基础上,我们的代码生成的输入数据。我们表明,尽管我们使用了全球数据集和综合需求,但我们的模型运行的未来欧洲电力系统中可再生能源的比例很高,与更详细的模型的结果一致。
Cost optimal scenarios of a future highly renewable European electricity system: Exploring the influence of weather data, cost parameters and policy constraints
Evaluating Policy Implications on the Restrictiveness of Flow-based Market Coupling with High Shares of Intermittent Generation: A Case Study for Central Western Europe