arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 1907.00902math.OC
收藏

多部件维修Optimization:一种随机规划方法

Multi-component Maintenance Optimization: A Stochastic Programming Approach

Zhicheng Zhu, Yisha Xiang, Bo Zeng

摘要:

在过去的几十年中,维修优化得到了广泛的研究。然而,现有的大多数维护模型集中在单组件系统,并不适用于由多个组件组成的复杂系统,由于组件之间的各种相互作用。多部件维修最优化问题是将部件故障的随机过程与维修活动分组的组合问题相结合的问题,在建模和求解技术上都具有挑战性,在文献中一直是一个未解决的问题。本文研究了有限规划期内的多部件维修问题,并将其表示为一个具有决策依赖不确定性的多阶段随机整数规划问题。目前还缺乏通用的有效方法来解决这类问题。为了应对这一挑战,我们使用了另一种方法来模拟潜在的故障过程,并开发了一种新的两阶段模型,没有决策依赖的不确定性。研究了两阶段问题的结构特性,并基于结构特性提出了一种基于渐进式套期保值的启发式算法。我们的启发式算法表现出显着改善的能力,在处理实际的大规模的两阶段问题相比,三个传统的方法随机整数规划,并解决两阶段模型,我们的启发式在滚动时域提供了一个很好的近似的多阶段问题。启发式进一步基准与文献中普遍采用的动态规划方法。数值结果表明,我们的启发式可以导致显着的成本节省与基准方法相比。

英文摘要:

Maintenance optimization has been extensively studied in the past decades. However, most of the existing maintenance models focus on single-component systems and are not applicable for complex systems consisting of multiple components, due to various interactions between the components. Multi-component maintenance optimization problem, which joins the stochastic processes regarding the failures of the components with the combinatorial problems regarding the grouping of maintenance activities, is challenging in both modeling and solution techniques, and has remained as an open issue in the literature. In this paper, we study the multi-component maintenance problem over a finite planning horizon and formulate the problem as a multi-stage stochastic integer program with decision-dependent uncertainty. There is a lack of general efficient methods to solve this type of problem. To address this challenge, we use an alternative approach to model the underlying failure process and develop a novel two-stage model without decision-dependent uncertainty. Structural properties of the two-stage problem are investigated, and a progressive-hedging-based heuristic is developed based on the structural properties. Our heuristic algorithm demonstrates a significantly improved capacity in handling practically large-size two-stage problems comparing to three conventional methods for stochastic integer programming, and solving the two-stage model by our heuristic in a rolling horizon provides a good approximation of the multi-stage problem. The heuristic is further benchmarked with a dynamic programming approach commonly adopted in the literature. Numerical results show that our heuristic can lead to significant cost savings compared with the benchmark approach.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑