arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1808.05046eess.SYcs.SY
收藏

利用供水网络收集可再生能源

Utilization of Water Supply Networks for Harvesting Renewable Energy

University of Illinois at Urbana-Champaign(伊利诺伊大学厄巴纳-香槟分校)

Dariush Fooladivanda, Alejandro D. Domínguez-García, Peter W. Sauer

AI总结:

本文提出利用供水网络中的水泵和水箱吸收电网中可再生能源过剩电力的方法,通过非凸优化问题求解并转换为混合整数二次锥规划问题,通过数值模拟验证有效性。

摘要:

由于间歇性可再生能源的渗透率增加,可再生能源过剩电力正在增加。在实践中,电力调度运营商要么削减由可再生能源发电产生的过剩能源,要么利用储能资源来吸收它。本文提出了一种利用供水网络中的水泵和水箱来吸收电网中由可再生能源发电资源产生的过剩电力的框架。我们对供水网络进行了分析建模,并提出了一种两步程序,利用供水网络中的水箱来收集电网中的过剩能量。在每一步中,供水网络运营商都需要解决一个非凸优化问题。为了计算最优泵调度和水流量,我们开发了一种二次锥松弛和近似技术,使所提出的问题能够转换为混合整数二次锥规划问题。然后,我们提供了所提出松弛的精确条件,并提供了一个算法,从松弛问题的解构造原始问题的精确解。我们通过数值模拟展示了所提框架的有效性。

英文摘要:

Renewable surplus power is increasing due to the increasing penetration of these intermittent resources. In practice, electric grid operators either curtail the surplus energy resulting from renewable-based generations or utilize energy storage resources to absorb it. In this paper, we propose a framework for utilizing water pumps and tanks in water supply networks to absorb the surplus electrical energy resulting from renewable-based electricity generation resources in the electrical grid. We model water supply networks analytically, and propose a two-step procedure that utilizes the water tanks in the water supply network to harvest the surplus energy from an electrical grid. In each step, the water network operator needs to solve an optimization problem that is non-convex. To compute optimal pump schedules and water flows, we develop a second-order cone relaxation and an approximation technique that enable us to transform the proposed problems into mixed-integer second-order cone programs. We then provide the conditions under which the proposed relaxation is exact, and present an algorithm for constructing an exact solution to the original problem from a solution to the relaxed problem. We demonstrate the effectiveness of the proposed framework via numerical simulations.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑