This paper presents different methods for solving parallel machine scheduling problems with precedence constraints and setup times between the jobs. Limited discrepancy search methods mixed with local search principles, dominance conditions and specific lower bounds are proposed. The proposed methods are evaluated on a set of randomly generated instances and compared with previous results from the literature and those obtained with an efficient commercial solver. We conclude that our propositions are quite competitive and our results even outperform other approaches in most cases.
Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with makespan, flow-time, which measures the length of time a job spends in a system before it completes, is arguably the most important metric to measure the performance of a scheduling algorithm. In recent years, there has been a remarkable progress in understanding flow-time based objective functions in diverse settings such as unrelated machines scheduling, bro…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence constraints. The goal is to compute a feasible schedule that minimizes the sum of penalties of late jobs. Lenstra and Rinnoy Kan [Annals of Disc. Math., 1977] in their seminal work introduced this problem and showed that it is strongly NP-hard, even when all processing times and weights are 1. We study the approximability of the problem and our main result …
A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last open problems from the book of Garey and Johnson. We show that for fixed $m$ and $ε$, $(\log n)^{O(1)}$ rounds of Sherali-Adams hierarchy applied to a natural LP of the problem provides a $(1+ε)$-approximation algorithm running in quasi-polynomial time. This improves over the recent result of Levey and Rothvoss, who used $r=(\log n)^{O(\log \log n)}$ rounds of…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is well-known to be NP-hard for an unbounded number of machines. Using standard 3-field notation, it is known as $P|\text{prec}, p_j=1|C_{\max}$. We present an algorithm for this problem that runs in $O(1.995^n)$ time. Before our work, even for $m=3$ machines the best known algorithms ran in $O^\ast(2^n)$ time. In contrast, our algorithm works when the number of mac…
Coflow is a recently proposed network abstraction for data-parallel computing applications. This paper considers scheduling coflows with precedence constraints in identical parallel networks, such as to minimize the total weighted completion time of coflows. The identical parallel network is an architecture based on multiple network cores running in parallel. In the divisible coflow scheduling problem, the proposed algorithm achieves $(6-\frac{2}{m})μ$ and $(5-\frac{2}{m})μ$ approximate ratios for arbitrary release time and zero release time, respectively, where $m$ is the number of network co…
We consider the problem of scheduling a set of $n$ tasks on $m$ processors under precedence, communication, and global system energy constraints to minimize makespan. We extend existing scheduling models to account for energy usage and give convex programming algorithms that yield essentially the same results as existing algorithms that do not consider energy, while adhering to a strict energy bound.
Scheduling jobs with precedence constraints on a set of identical machines to minimize the total processing time (makespan) is a fundamental problem in combinatorial optimization. In practical settings such as cloud computing, jobs are often malleable, i.e., can be processed on multiple machines simultaneously. The instantaneous processing rate of a job is a non-decreasing function of the number of machines assigned to it (we call it the processing function). Previous research has focused on practically relevant concave processing functions, which obey the law of diminishing utility and genera…
We give a $(2 + ε)$-approximation algorithm for minimizing total weighted completion time on a single machine under release time and precedence constraints. This settles a recent conjecture made in [18]
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on identical and unrelated parallel processors. For identical processors, we present LP-based O(1)-approximation algorithms. For unrelated processors, the approximation ratio naturally depends on the maximum number of rounds of any job. Since the number of rounds per job in typical MapReduce algorithms is a small constant, our scheduling algorithms achieve a small…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation algorithms that use only sublinear space or sublinear time. We develop the first one-pass streaming approximation schemes using sublinear space when all jobs' processing times differ no more than a constant factor $c$ and the number of machines $m$ is at most $\tfrac {2n ε}{3 h c }$. This is so far the best approximation we can have in terms of $m$, since no pol…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the scheduler has to wait between the two jobs if they are scheduled on different machines. The objective is to assign the jobs to machines to minimize the makespan of the schedule. Despite being a fundamental problem in theory and a consequential problem in practice, the approximability of scheduling problems with communication delays is not very well understood. On…
We study the classic problem of scheduling $n$ precedence constrained unit-size jobs on $m = O(1)$ machines so as to minimize the makespan. In a recent breakthrough, Levey and Rothvoss \cite{LR16} developed a $(1+ε)$-approximation for the problem with running time $\exp\Big(\exp\Big(O\big(\frac{m^2}{ε^2}\log^2\log n\big)\Big)\Big)$, via the Sherali-Adams lift of the basic linear programming relaxation for the problem by $\exp\Big(O\big(\frac{m^2}{ε^2}\log^2\log n\big)\Big)$ levels. Garg \cite{Garg18} recently improved the number of levels to $\log ^{O(m^2/ε^2)}n$, and thus the running time to …
Efficient Approximation Algorithms for Scheduling Coflows with Precedence Constraints in Identical Parallel Networks to Minimize Weighted Completion Time
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph, $G = (V, E)$. In this setting, if two precedence-constrained jobs $u$ and $v$, with $v$ dependent on $u$ ($u \prec v$), are scheduled on different machines, then $v$ must start at least $ρ$ time units after $u$ completes. The scheduling objective is to minimize makespan, i.e. the total time from when the first job starts to when the last job finishes. The f…
The scheduling literature has traditionally focused on a single type of resource (e.g., computing nodes). However, scientific applications in modern High-Performance Computing (HPC) systems process large amounts of data, hence have diverse requirements on different types of resources (e.g., cores, cache, memory, I/O). All of these resources could potentially be exploited by the runtime scheduler to improve the application performance. In this paper, we study multi-resource scheduling to minimize the makespan of computational workflows comprised of parallel jobs subject to precedence constraint…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the unrelated machine scheduling problem for minimizing weighted sum completion time under arbitrary precedence constraints and on heterogeneous machines with different processing speeds. The problem is known to be strongly NP-hard even in the single machine setting. By making use of Queyranne's constraint set and constructing a novel Linear Programming relaxation for t…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is a constant is a well-known question in scheduling theory. Indeed, an outstanding open problem from the classic book of Garey and Johnson asks whether this problem is NP-hard even in the case of 3 machines and unit-length jobs. In a recent breakthrough, Levey and Rothvoss gave a $(1+ε)$-approximation algorithm, which runs in nearly quasi-polynomial time, for…
We study a natural variant of scheduling that we call \emph{partial scheduling}: In this variant an instance of a scheduling problem along with an integer $k$ is given and one seeks an optimal schedule where not all, but only $k$ jobs, have to be processed. Specifically, we aim to determine the fine-grained parameterized complexity of partial scheduling problems parameterized by $k$ for all variants of scheduling problems that minimize the makespan and involve unit/arbitrary processing times, identical/unrelated parallel machines, release/due dates, and precedence constraints. That is, we inve…
We consider the online problem of scheduling jobs on identical machines, where jobs have precedence constraints. We are interested in the demanding setting where the jobs sizes are not known up-front, but are revealed only upon completion (the non-clairvoyant setting). Such precedence-constrained scheduling problems routinely arise in map-reduce and large-scale optimization. In this paper, we make progress on this problem. For the objective of total weighted completion time, we give a constant-competitive algorithm. And for total weighted flow-time, we give an $O(1/ε^2)$-competitive algorithm …
In the SCHED problem we are given a set of n jobs, together with their processing times and precedence constraints. The task is to order the jobs so that their total completion time is minimized. SCHED is a special case of the Traveling Repairman Problem with precedences. A natural dynamic programming algorithm solves both these problems in 2^n n^O(1) time, and whether there exists an algorithms solving SCHED in O(c^n) time for some constant c < 2 was an open problem posted in 2004 by Woeginger. In this paper we answer this question positively.
In a classical problem in scheduling, one has $n$ unit size jobs with a precedence order and the goal is to find a schedule of those jobs on $m$ identical machines as to minimize the makespan. It is one of the remaining four open problems from the book of Garey & Johnson whether or not this problem is $\mathbf{NP}$-hard for $m=3$. We prove that for any fixed $\varepsilon$ and $m$, an LP-hierarchy lift of the time-indexed LP with a slightly super poly-logarithmic number of $r = (\log(n))^{Θ(\log \log n)}$ rounds provides a $(1 + \varepsilon)$-approximation. For example Sherali-Adams suffices as…
Inapproximability of Unique-Machine Precedence Scheduling for Unit-Length Jobs
Simons Institute for the Theory of Computing, and Departments of EECS & Mathematics, UC Berkeley(加州大学伯克利分校);Department of EECS, UC Berkeley(加州大学伯克利分校);Institute for Interdisciplinary Information Sciences, Tsinghua University(清华大学交叉信息研究院)
This paper presents improved approximation algorithms for the problem of multiprocessor scheduling under uncertainty, or SUU, in which the execution of each job may fail probabilistically. This problem is motivated by the increasing use of distributed computing to handle large, computationally intensive tasks. In the SUU problem we are given n unit-length jobs and m machines, a directed acyclic graph G of precedence constraints among jobs, and unrelated failure probabilities q_{ij} for each job j when executed on machine i for a single timestep. Our goal is to find a schedule that minimizes th…
We consider the problem of scheduling $n$ precedence-constrained jobs on $m$ uniformly-related machines in the presence of an arbitrary, fixed communication delay $ρ$. We consider a model that allows job duplication, i.e. processing of the same job on multiple machines, which, as we show, can reduce the length of a schedule (i.e., its makespan) by a logarithmic factor. Our main result is an $O(\log m \log ρ/ \log \log ρ)$-approximation algorithm for minimizing makespan, assuming the minimum makespan is at least $ρ$. Our algorithm is based on rounding a linear programming relaxation for the pro…
Resource Constrained Project Scheduling Problems (RCPSPs) without preemption are well-known NP-hard combinatorial optimization problems. A feasible RCPSP solution consists of a time-ordered schedule of jobs with corresponding execution modes, respecting precedence and resources constraints. In this paper, we propose a cutting plane algorithm to separate five different cut families, as well as a new preprocessing routine to strengthen resource-related constraints. New lifted versions of the well-known precedence and cover inequalities are employed. At each iteration, a dense conflict graph is b…
We consider single-machine scheduling problems that are natural generalizations or variations of the min-sum set cover problem and the min-sum vertex cover problem. For each of these problems, we give new approximation algorithms. Some of these algorithms rely on time-indexed LP relaxations. We show how a variant of alpha-point scheduling leads to the best-known approximation ratios, including a guarantee of 4 for an interesting special case of the so-called generalized min-sum set cover problem. We also make explicit the connection between the greedy algorithm for min-sum set cover and the co…
We consider online scheduling to minimize weighted completion time on related machines, where each job consists of several tasks that can be concurrently executed. A job gets completed when all its component tasks finish. We obtain an $O(K^3 \log^2 K)$-competitive algorithm in the non-clairvoyant setting, where $K$ denotes the number of distinct machine speeds. The analysis is based on dual-fitting on a precedence-constrained LP relaxation that may be of independent interest.
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related machines such that machine $i$ can execute up to $m_i$ jobs at a time. Each machine $i$ has an in-delay $ρ^{\mathrm{in}}_i$ and out-delay $ρ^{\mathrm{out}}_i$. Likewise, each job $v$ has an in-delay $ρ^{\mathrm{in}}_v$ and out-delay $ρ^{\mathrm{out}}_v$. In a schedule, job $v$ may be executed on machine $i$ at time $t$ if each predecessor $u$ of $v$ is completed on…
We consider non-clairvoyant scheduling with online precedence constraints, where an algorithm is oblivious to any job dependencies and learns about a job only if all of its predecessors have been completed. Given strong impossibility results in classical competitive analysis, we investigate the problem in a learning-augmented setting, where an algorithm has access to predictions without any quality guarantee. We discuss different prediction models: novel problem-specific models as well as general ones, which have been proposed in previous works. We present lower bounds and algorithmic upper bo…
Parameterized Complexity of Scheduling Problems in Robotic Process Automation
Czech Technical University in Prague(布拉格捷克技术大学);Czech Institute of Informatics, Robotics and Cybernetics, Czech Technical University in Prague(捷克技术大学捷克斯洛伐克信息学、机器人学与自动化研究所);Sorbonne University(索邦大学);CNRS(法国国家科学研究中心)
We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many previous 15 to 20-year-old state-of-art results. A major theme in these results is the use of time-indexed linear programming relaxations. These are natural relaxations for their respective problems, but surprisingly are not studied in the literature. We also consider the scheduling problem of minimizing total weighted completion time on unrelated machines.…
A multiple server setting is considered, where each server has tunable speed, and increasing the speed incurs an energy cost. Jobs arrive to a single queue, and each job has two types of sub-tasks, map and reduce, and a {\bf precedence} constraint among them: any reduce task of a job can only be processed once all the map tasks of the job have been completed. In addition to the scheduling problem, i.e., which task to execute on which server, with tunable speed, an additional decision variable is the choice of speed for each server, so as to minimize a linear combination of the sum of the flow …
Modern platforms are using accelerators in conjunction with standard processing units in order to reduce the running time of specific operations, such as matrix operations, and improve their performance. Scheduling on such hybrid platforms is a challenging problem since the algorithms used for the case of homogeneous resources do not adapt well. In this paper we consider the problem of scheduling a set of tasks subject to precedence constraints on hybrid platforms, composed of two types of processing units. We propose a $(3+2\sqrt{2})$-approximation algorithm and a conditional lower bound of 3…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches from processing jobs of one class to jobs of a different class. During such a setup, a machine cannot process jobs and the duration of a setup may depend on the machine as well as the class of the job to be processed next. For this problem, we study approximation algorithms for non-identical machines. We develop a polynomial-time approximation scheme for unifo…
The paper presents complexity results and performance guaranties for a family of approximation algorithms for an optimisation problem arising in software testing and manufacturing. The problem is formulated as a partitioning of a set where each element has an associated subset in another set, but can also be viewed as a scheduling problem with infinitely large communication delay, precedence constraints in the form of a bipartite graph, and duplication.
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid C_{\mathsf{max}}$, if two dependent jobs are scheduled on different machines, then at least $c$ units of time must pass between their executions. Despite its relevance to many applications, this model remains one of the most poorly understood in scheduling theory. Even for a special case where an unlimited number of machines is available, the best known approximation…
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machine-, and sequence-independent. Problems of this kind were encountered when modelling practical problems in planning disaster relief operations. Our main algorithmic result is a polynomial-time algorithm for mini…
Consider the problem in which n jobs that are classified into k types are to be scheduled on m identical machines without preemption. A machine requires a proper setup taking s time units before processing jobs of a given type. The objective is to minimize the makespan of the resulting schedule. We design and analyze an approximation algorithm that runs in time polynomial in n, m and k and computes a solution with an approximation factor that can be made arbitrarily close to 3/2.
Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing of operations of different families. A job is completed when its latest operation completes and the goal is to minimize the total weighted completion time of all jobs. We study this problem from the perspective of approximability and provide constant factor approximations as well as an inapproximability result. Prior to this work, only the NP-hardness of the …
Given unit execution time (UET) tasks whose precedence constraints form a directed acyclic graph (DAG), the arcs are associated with unit communication time (UCT) delays. The problem is to schedule the tasks on two processors in order to minimize the makespan. Several polynomial algorithms in the literature are proposed for special classes of digraphs, but the complexity of solving this problem in general case stills a challenging open question. We propose in this paper a linear time algorithm to compute an optimal schedule for the class of DAGs of depth two.
Integer linear programs of configurations, or configuration IPs, are a classical tool in the design of algorithms for scheduling and packing problems, where a set of items has to be placed in multiple target locations. Herein a configuration describes a possible placement on one of the target locations, and the IP is used to chose suitable configurations covering the items. We give an augmented IP formulation, which we call the module configuration IP. It can be described within the framework of n-fold integer programming and therefore be solved efficiently. As an application, we consider sche…
We present a unified framework for minimizing average completion time for many seemingly disparate online scheduling problems, such as the traveling repairperson problems (TRP), dial-a-ride problems (DARP), and scheduling on unrelated machines. We construct a simple algorithm that handles all these scheduling problems, by computing and later executing auxiliary schedules, each optimizing a certain function on already seen prefix of the input. The optimized function resembles a prize-collecting variant of the original scheduling problem. By a careful analysis of the interplay between these auxi…
Consider a set of jobs connected to a directed acyclic task graph with a fixed source and sink. The edges of this graph model precedence constraints and the jobs have to be scheduled with respect to those. We introduce the Server Cloud Scheduling problem, in which the jobs have to be processed either on a single local machine or on one of many cloud machines. Both the source and the sink have to be scheduled on the local machine. For each job, processing times both on the server and in the cloud are given. Furthermore, for each edge in the task graph, a communication delay is included in the i…
Consider a problem in which $n$ jobs that are classified into $k$ types arrive over time at their release times and are to be scheduled on a single machine so as to minimize the maximum flow time. The machine requires a setup taking $s$ time units whenever it switches from processing jobs of one type to jobs of a different type. We consider the problem as an online problem where each job is only known to the scheduler as soon as it arrives and where the processing time of a job only becomes known upon its completion (non-clairvoyance). We are interested in the potential of simple "greedy-like"…
Static (offline) techniques for mapping applications given by task graphs to MPSoC systems often deliver overly pessimistic and thus suboptimal results w.r.t. exploiting time slack in order to minimize the energy consumption. This holds true in particular in case computation times of tasks may be workload-dependent and becoming known only at runtime or in case of conditionally executed tasks or scenarios. This paper studies and quantitatively evaluates different classes of algorithms for scheduling periodic applications given by task graphs (i.e., DAGs) with precedence constraints and a global…
University of Nottingham(诺丁汉大学);University of Essex(埃塞克斯大学)
Multi-mode resource and precedence-constrained project scheduling is a well-known challenging real-world optimisation problem. An important variant of the problem requires scheduling of activities for multiple projects considering availability of local and global resources while respecting a range of constraints. A critical aspect of the benchmarks addressed in this paper is that the primary objective is to minimise the sum of the project completion times, with the usual makespan minimisation as a secondary objective. We observe that this leads to an expected different overall structure of goo…
A MILP model for an extended version of the Flexible Job Shop Scheduling problem is proposed. The extension allows the precedences between operations of a job to be given by an arbitrary directed acyclic graph rather than a linear order. The goal is the minimization of the makespan. Theoretical and practical advantages of the proposed model are discussed. Numerical experiments show the performance of a commercial exact solver when applied to the proposed model. The new model is also compared with a simple extension of the model described by Özgüven, Özbakir, and Yavuz (Mathematical models for …
We investigate the scheduling of $n$ jobs divided into $c$ classes on $m$ identical parallel machines. For every class there is a setup time which is required whenever a machine switches from the processing of one class to another class. The objective is to find a schedule that minimizes the makespan. We give near-linear approximation algorithms for the following problem variants: the non-preemptive context where jobs may not be preempted, the preemptive context where jobs may be preempted but not parallelized, as well as the splittable context where jobs may be preempted and parallelized. We …
This article considers the parallel machine scheduling problem with step-deteriorating jobs and sequence-dependent setup times. The objective is to minimize the total tardiness by determining the allocation and sequence of jobs on identical parallel machines. In this problem, the processing time of each job is a step function dependent upon its starting time. An individual extended time is penalized when the starting time of a job is later than a specific deterioration date. The possibility of deterioration of a job makes the parallel machine scheduling problem more challenging than ordinary o…
Scalable Neighborhood Local Search for Single-Machine Scheduling with Family Setup Times
Hochschule Bielefeld – University of Applied Sciences and Arts, Bielefeld, Germany(比勒费尔德应用科学与艺术大学);Fraunhofer IOSB-INA, Lemgo, Germany(弗劳恩霍夫 IOSB-INA 研究所);Friedrich Schiller University Jena, Institute of Computer Science, Jena, Germany(耶拿弗里德里希·席勒大学);Sollich KG, Bad Salzuflen, Germany(索利奇股份公司);LaBRI, CNRS, Université de Bordeaux, Bordeaux INP, France(法国国家科学研究中心拉布里实验室)