资源受限项目调度的强界:预处理和切割平面
Strong Bounds for Resource Constrained Project Scheduling: Preprocessing and Cutting Planes
摘要:
无抢占的资源受限项目调度问题是一个NP难的组合优化问题。一个可行的RCPSP解决方案包括一个时间顺序的作业与相应的执行模式,尊重优先级和资源约束。在本文中,我们提出了一个切割平面算法来分离五个不同的切割家庭,以及一个新的预处理例程,以加强资源相关的约束。新的解除版本的著名的优先级和覆盖不平等。在每一次迭代中,建立一个稠密的冲突图,考虑可行性和最优性条件,以分离集团,奇洞和加强Chvátal-Gomory割。所提出的策略大大提高了线性松弛界限,允许最先进的混合整数线性规划求解器找到可证明的最佳解决方案,为754个先前开放的实例的不同变体的RCPSP,这是不可能使用原始的线性规划公式。
英文摘要:
Resource Constrained Project Scheduling Problems (RCPSPs) without preemption are well-known NP-hard combinatorial optimization problems. A feasible RCPSP solution consists of a time-ordered schedule of jobs with corresponding execution modes, respecting precedence and resources constraints. In this paper, we propose a cutting plane algorithm to separate five different cut families, as well as a new preprocessing routine to strengthen resource-related constraints. New lifted versions of the well-known precedence and cover inequalities are employed. At each iteration, a dense conflict graph is built considering feasibility and optimality conditions to separate cliques, odd-holes and strengthened Chvátal-Gomory cuts. The proposed strategies considerably improve the linear relaxation bounds, allowing a state-of-the-art mixed-integer linear programming solver to find provably optimal solutions for 754 previously open instances of different variants of the RCPSPs, which was not possible using the original linear programming formulations.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。