The KEK Accelerator Test Facility (ATF) is a dedicated testbed for nanobeam technologies in support of the International Linear Collider (ILC). Stable pulsed operation requires synchronization of the facility timing system with the Low-Level RF (LLRF) system. The timing system distributes trigger and gate signals to key subsystems, including the DAQ, klystrons, laser systems, pulsed kicker magnets, and interlocks. The LLRF system provides phase-coherent RF references and facility-wide clock distribution for synchronization. Achieving ~100 fs-level synchronization depends critically on the phase-noise power spectral density (PN-PSD) of the distributed clock signals and on preserving this performance throughout the distribution network. We present facility-wide measurements of the KEK ATF LLRF clock PN-PSD and discuss the resulting synchronization floor imposed by the stability of the ATF Linac and Damping Ring signal generators.
Beam halo is one of the crucial issues limiting the machine performance and causing radioactivation in high-intensity accelerators. A clear picture of beam-halo formation is of great importance for successful suppression of the undesired beam loss. We present numerical and experimental studies of transverse and longitudinal halos in the KEK Accelerator Test Facility. The fair accordance between predictions and observations in various conditions indicates that the Touschek scattering is the dominant mechanism forming the horizontal and momentum halos.
Pulse-to-pulse orbit jitter, if not controlled, can drastically degrade the luminosity in future linear colliders. The second goal of the ATF2 project at the KEK accelerator test facility is to stabilise the vertical beam position down to approximately 5% of the nominal rms vertical beam size at the virtual Interaction Point (IP). This will require control of the orbit to better than 1 micrometre at the entrance of the ATF2 final focus system. In this report simulation studies are presented for vertical jitter propagation through the ATF2 extraction line and final focus system, and the jitter …
The investigation of beam halo transverse distributions is important for the understanding of beam losses and the control of backgrounds in Future Linear Colliders (FLC). A novel in vacuum diamond sensor (DSv) scanner with four strips has been designed and developed for the investigation of the beam halo transverse distributions and also for the diagnostics of Compton recoil electrons after the interaction point (IP) of ATF2, a low energy (1.3 GeV) prototype of the final focus system for the ILC and CLIC linear collider projects. Using the DSv, a dynamic range of $\sim10^6$ has been successful…
We present the current and planned beam physics research program and accelerator education program at Advanced Superconducting Test Accelerator (ASTA) at Fermilab.
Fermilab is currently constructing a superconducting electron linac that will eventually serve as the backbone of a user-driven facility for accelerator science. This contribution describes the accelerator and summarizes the enabled research thrusts. A detailed description of the facility can be found at [\url{http://apc.fnal.gov/programs2/ASTA_TEMP/index.shtml}].
A laserwire transverse electron beam size measurement system has been developed and operated at the Accelerator Test Facility 2 (ATF2) at KEK. Special electron beam optics were developed to create an approximately 1 x 100 μm (vertical x horizontal) electron beam at the laserwire location, which was profiled using a 150 mJ, 71 ps laser pulse with a wavelength of 532 nm. The precise characterisation of the laser propagation allows the non-Gaussian transverse profiles of the electron beam caused by the laser divergence to be deconvolved. A minimum vertical electron beam size of 1.07 ${\pm}$ 0.06 …
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under…
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility.
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for al…
The Horizon 2020 Project EuPRAXIA (European Plasma Research Accelerator with eXcellence In Applications) is preparing a conceptual design for a highly compact and cost-effective European facility with multi-GeV electron beams using plasma as the acceleration medium. The design includes two user areas: one for FEL science and one for High Energy Physics (HEP) detector development and other pilot applications. The accelerator facility will be based on a laser and/or a beam driven plasma acceleration approach. This contribution introduces layout considerations of the future plasma accelerator fac…
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recent…
A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented.
The main `bottleneck' limiting the beam power in circular machines is caused by space charge effects that produce beam instabilities. To increase maximally the beam power of a `proton driver', it is proposed to build a facility consisting solely of a 2.5-GeV injector linac (PI) and a 20-GeV pulsed superconducting linac (SCL). Such a facility could be constructed using the existing KEK accelerator infrastructure. The PI, based on the European Spallation Source (ESS) linac, would serve both as an injector to the SCL and a source of proton beams that could be used to copiously produce, e.g., neut…
The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule #1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural nois…
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway …
The Extreme Light Infrastructure (ELI) Beamlines is a laser driven accelerator facility located in the outskirts of the city of Prague. With its state-of-the-art lasers, it will carry out an ambitious and diverse research program. Activities at ELI Beamlines can be broken down in complementary areas of scientific interest: development and testing of novel technologies for multi-PW laser systems, plasma physics, high field physics experiments, production of femtosecond secondary sources of ionizing radiation (extreme ultraviolet radiation, X rays, gamma, electrons, and protons)to be used in int…
ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.
The 3 MV Tandem Pelletron accelerator at the Spanish Accelerator Laboratory (CNA) has been recently upgraded to produce pulsed ion beams for neutron Time-Of-Flight (TOF) measurements. The upgrade has consisted of two actions: a pulsing system installed at the low energy part of the Tandem accelerator and a new line fully equipped. The pulsing system provides approximately one nanosecond pulse width of protons with variable repetition rates from kHz down to MHz. The new line is equipped with conventional devices and a pick-up for timing measurements with high resolution. The properties of the w…
The HICAT project is a Heavy Ion accelerator for light ion Cancer Treatment to be built for the clinics in Heidelberg, Germany. It consists of a 7 MeV/u linac, a compact synchrotron and three treatment places, one of them equipped with a 360 degree gantry beam-line. The facility will implement the intensity controlled raster-scanning technique that was developed and successfully demonstrated at GSI with over 100 patients at present. In order to produce the beams with the characteristics requested by the treatment sequencer, the accelerator must operate on a pulse-to-pulse basis with different …
We describe a novel technique, based on image compression and machine learning, for transverse phase space tomography in two degrees of freedom in an accelerator beamline. The technique has been used in the CLARA accelerator test facility at Daresbury Laboratory: results from the machine learning method are compared with those from a conventional tomography algorithm (algebraic reconstruction), applied to the same data. The use of machine learning allows reconstruction of the 4D phase space distribution of the beam to be carried out much more rapidly than using conventional tomography algorith…
The Fusion Prototypic Neutron Source (FPNS) is considered to be a testbed for scientific understanding of material degradation in future nuclear fusion reactors [1-3]. The primary mission of FPNS is to provide a damage rate in iron samples of 8-11 dpa/calendar year with He/dpa ratio of ~10 appm in irradiation volume of 50 cm3 or larger with irradiation temperature 300 - 1000o C and flux gradient less than 20%/cm in the plane of the sample. The Los Alamos Neutron Science Center (LANSCE) is an attractive candidate for the FPNS project. The Accelerator Facility was designed and operated for an ex…
As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix workstations and VME computers since 1993. During the eight-year operation, we extended the system by introducing a) Windows PCs, b) PLC controllers with a network interface, and c) web servers based on modern information technology. Although such new subsystems are essential to improve control functionalities, they often cause communication problems with the or…
Muon-based facilities offer unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders. They rely on a novel technology with challenging parameters, for which the feasibility is currently being evaluated by the Muon Accelerator Program (MAP). A realistic scenario for a complementary series of staged facilities with increasing complexity and significant physics potential at each stage has been developed. It takes advantage of and leverages the capabilities already planned for Fermilab, especially the strategy for l…
The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150 MeV/c, respectively. The research program includes the study of nonlinear focusing integrable optical beam lattices based on special magnets and electron lenses, beam dynamics of space-charge effects and their compensation, optical stochastic cooling, and several other experiments. In this article, we present the design and main parameters of the facility, outl…
We compare three techniques for characterising the transverse phase space distribution of the beam in CLARA FE (the Compact Linear Accelerator for Research and Applications Front End, at Daresbury Laboratory, UK): emittance and optics measurements using screens at three separate beamline locations; quadrupole scans; and phase space tomography. We find that where the beam distribution has significant structure (as in the case of CLARA FE at the time the measurements presented here were made) tomography analysis is the most reliable way to obtain a meaningful characterisation of the transverse b…
Recently, the Turkic Accelerator Complex (TAC) is proposed as a regional facility for accelerator based fundamental and applied research. The complex will include linac on ring type electron-positron collider as a phi, charm and tau factory, linac based free electron laser (FEL), ring based third generation synchrotron radiation (SR) source and a few GeV proton accelerator. Preliminary estimations show that integral luminosity of hundred inverse femto-barns per year can be achieved for factory options. The FEL facility is planned to obtain laser beam between IR and soft X-ray region. In additi…
The 750-keV low-energy beam transport of the Los Alamos Neutron Science Center (LANSCE) linac consists of two independent beam lines that facilitate simultaneous injection of H+ and H- beams into the linear accelerator. The efficiency of beam transport within this structure is largely controlled by the effects of space-charge neutralization. In this paper, we report a series of experiments that were performed to determine the level, as well as the required timescale for the onset of beam space charge neutralization. Measurements performed along the structure indicate significant variation of n…
The Accelerator Test Facility 2 (ATF2) is a scaled demonstrator system for final focus beam lines of linear high energy colliders. This paper describes the high resolution cavity beam position monitor (BPM) system, which is a part of the ATF2 diagnostics. Two types of cavity BPMs are used, C-band operating at 6.423 GHz, and S-band at 2.888 GHz with an increased beam aperture. The cavities, electronics, and digital processing are described. The resolution of the C-band system with attenuators was determined to be approximately 250 nm and 1 m for the S-band system. Without attenuation the best r…
This paper presents the pre-experiment plan and prediction of the first stage of Vacuum Laser Acceleration (VLA) collaborating by UCLA, Fudan University and ATF-BNL. This first stage experiment is a Proof-of-Principle to support our previously posted novel VLA theory. Simulations show that based on ATF's current experimental conditions, the electron beam with initial energy of 15MeV can get net energy gain from intense CO2 laser beam. The difference of electron beam energy spread is observable by ATF beam line diagnostics system. Further this energy spread expansion effect increases along with…
For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being constructed for a nominal beam current of 3.5 A and 1.5 microsecond pulse length. The high current requires highly effective suppression of dipolar wakes. Two concepts are investigated for the accelerating structure design: the "Tapered Damped Structure" developed for the CLIC main beam, and the "Slotted Iris - Constant Aperture" structure. Both use 4 SiC loads per c…
We present a status update on the dedicated R\&D facility SINBAD which is currently under construction at DESY. The facility will host multiple independent experiments on the acceleration of ultra-short electron bunches and novel, high gradient acceleration methods. The first experiment is the ARES-experiment with a normal conducting 100\,MeV S-band linac at its core. We present the objectives of this experiment ranging from the study of compression techniques to sub-fs level to its application as injector for various advanced acceleration schemes e.g. the plans to use ARES as a test-site for …
In the control system of the JAERI-KEK joint project (High Intensity Proton Accelerator Facility), it is planned to employ network-based controllers such as PLC's and measurement stations instead of using other field control networks, since the network hardware and software can be standardized and they have been successfully utilized in other accelerator control systems in KEK. EPICS software support for those controllers was designed paying special attention to robustness and has been implemented and applied for the accelerator test stand. Basic functionalities were confirmed and miscellaneou…
An electron-proton/ion collider facility (eRHIC) is under consideration at Brookhaven National Laboratory (BNL). An overview of the accelerator and detector design concepts will be provided.
A staged approach towards muon based facilities for Intensity and Energy Frontier science, building upon existing and proposed facilities at Fermilab, is presented. At each stage, a facility exploring new physics also provides an R&D platform to validate the technology needed for subsequent stages. The envisioned program begins with nuSTORM, a sensitive sterile neutrino search which also provides precision neutrino cross-section measurements while developing the technology of using and cooling muons. A staged Neutrino Factory based upon Project X, sending beams towards the Sanford Underground …
Turkish Accelerator Center) project is aimed to build an accelerator center in Turkey. The first step of the project is to construct IR-FEL facility. The second stage is to build a synchrotron radiation facility named TURKAY, which is the third generation synchrotron radiation light source that aimed to achieve high brilliance photon beam from low emittance electron beam at 3 GeV. The electron beam parameters highly depend on the magnetic lattice of the storage ring. In this paper a low emittance storage ring for TURKAY is proposed and beam dynamic properties of the magnetic lattice are invest…
One of the future multi-MW accelerators is the LBNE Experiment where Fermilab aims to produce a beam of neutrinos with a 2.3 MW proton beam as part of a suite of experiments associated with Project X. Specifically, the LBNE Neutrino Beam Facility aims for a 2+ MW, 60 -120 GeV pulsed, high intensity proton beam produced in the Project X accelerator intercepted by a low Z solid target to facilitate the production of low energy neutrinos. The multi-MW level LBNE proton beam will be characterized by intensities of the order of 1.6 e+14 p/pulse, σ radius of 1.5 -3.5 mm and a 9.8 microsecond pulse l…
We present a facility for direct measurements at low and very low energies typical for nuclear astrophysics (NA). The facility consists of a small and robust tandem accelerator where irradiations are made, and an ultra-low background laboratory located in a salt mine where very low radio-activities can be measured. Both belong to Horia Hulubei National Institute for Physics and Nuclear Engineering (IFIN-HH) but are situated 120 km apart. Their performances are shown using a few cases where they are used. We argue that this facility is competitive for the study of nuclear reactions induced by a…
We present a conceptual design for a novel continuous wave electron-linac based high-intensity high-brightness slow-positron production source with a projected intensity on the order of 10$^{10}$ e$^+$/s. Reaching this intensity in our design relies on the transport of positrons (T$_+$ below 600 keV) from the electron-positron pair production converter target to a low-radiation and low-temperature area for moderation in a high-efficiency cryogenic rare gas moderator, solid Ne. This design progressed through Monte Carlo optimizations of: electron/positron beam energies and converter target thic…
Test beam and irradiation facilities are the key enabling infrastructures for research in high energy physics (HEP) and astro-particles. In the last 11 years the Beam-Test Facility (BTF) of the DAΦNE accelerator complex in the Frascati laboratory has gained an important role in the European infrastructures devoted to the development and testing of particle detectors. At the same time the BTF operation has been largely shadowed, in terms of resources, by the running of the DAΦNE electron-positron collider. The present proposal is aimed at improving the present performance of the facility from t…
Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator physics design, and the technological basis for such a facility. Part 2 is available as arXiv:1306.5009 [hep-ex] and Part 3 is available as arXiv:1306.5024 [physics.acc-ph].
The Advanced Superconducting Test Accelerator (ASTA) currently under commissioning at Fermilab will enable a broad range of beam-based experiments to study fundamental limitations to beam intensity and to develop transformative approaches to particle-beam generation, acceleration and manipulation. ASTA incorporates a superconducting radiofrequency (SRF) linac coupled to a photoinjector and small-circumference storage ring capable of storing electrons or protons. ASTA will establish a unique resource for R&D towards Energy Frontier facilities and a test-bed for SRF accelerators and high-brightn…
A timing system provides high-precision signals to allow the controls over a variety of hardware and software components in the accelerator complex. This is guaranteed by the radio frequency (RF) and trigger signal synchronization for subsystems such as klystrons, pulsed magnets, and beam monitors. The main trigger signal should be distributed throughout the facility and repeated at the beam repetition rate. This trigger signal is usually generated by the same phase of an AC power line to follow the source of the fluctuation of an electrical grid and reduce the unwanted variation of the beam q…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under construction in Batavia, Illinois (USA). After completion, the superconducting linac will be the starting point for the 1.2 MW (Phase 1) and 2.4-MW (Phase 2) proton beam that is needed for the Long-Baseline Neutrino Facility (LBNF) at Fermilab [2]. Due to unavoidable loss of a fraction of the beam in the accelerator components, a certain level of radiation will be…
The Integrable Optics Test Accelerator (IOTA) at the Fermilab Accelerator Science & Technology (FAST) Facility is beginning operations, with an experimental program aimed at developing technology to enable future high intensity particle beams. The results garnered from IOTA should allow for better control of beam losses, leading to higher safely achievable beam power. This will be particularly useful for future accelerator based neutrino experiments. Two of the R&D efforts at IOTA, Nonlinear Integrable Optics and Electron Column-based space charge compensation, are discussed here.
The Centre for the Clinical Application of Particles' Laser-hybrid Accelerator for Radiobiological Applications (LhARA) facility is being studied and requires simulation of novel accelerator components (such as the Gabor lens capture system), detector simulation and simulation of the ion beam interaction with cells. The first stage of LhARA will provide protons up to 15 MeV for in vitro studies. The second stage of LhARA will use a fixed-field accelerator to increase the energy of the particles to allow in vivo studies with protons and in vitro studies with heavier ions. BDSIM, a Geant4 based …
Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum chambers in the event of an aberrant accelerator pulse. The accelerator is being designed with the capability to operate with up to 3000 bunches per macro-pulse, 5Hz repetition rate and 1.5 GeV beam energy. It will be able to sustain an average beam power of 72 KW at the bunch charge of 3.2 nC. Operation at full intensity will deposit enough energy in niobium material to approach the melting point of 2500 °C. In the e…
A high energy beam absorber has been built for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab. In the facility's initial configuration, an electron beam will be accelerated through 3 TTF-type or ILC-type RF cryomodules to an energy of 750MeV. The electron beam will be directed to one of multiple downstream experimental and diagnostic beam lines and then deposited in one of two beam absorbers. The facility is designed to accommodate up to 6 cryomodules, which would produce a 75kW beam at 1.5GeV; this is the driving design condition for the beam absorbers. The beam absorbers co…
CEBAF, the Continuous Electron Beam Accelerator Facility, has been actively serving the nuclear physics research community as a unique forefront international resource since 1995. This CW electron linear accelerator (linac) at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility (Jefferson Lab) has continued to evolve as a precision tool for discerning the structure and dynamics within nuclei. Superconducting RF (SRF) technology has been the essential foundation for CEBAF, first as a 4 GeV machine, then 6 GeV, and currently capable of 12 GeV. We review the development…
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an accelerator places stringent requirements on beam line diagnostics. These crucial beam measurements include bunch currents, beam orbit, beam phase, bunch length, transverse profile and emittance, beam hal…
Crystal channeling technology has offered various opportunities in accelerator community with a viability of ultrahigh gradient (TV/m) acceleration for future HEP collider in Energy Frontier. The major challenge of the channeling acceleration is that ultimate acceleration gradients might require high power driver at hard x-ray regime (~ 40 keV), exceeding those conceivable for x-rays as of today, though x-ray lasers can efficiently excite solid plasma and accelerate particles inside a crystal channel. Moreover, only disposable crystal accelerators are possible at such high externally excited f…