arXivDaily arXiv每日学术速递 周一至周五更新
arXiv physics/0008052physics.acc-ph
收藏

CLIC试验设备(CTF 3)驱动梁的3 GHz加速器结构设计

Design of a 3 GHz Accelerator Structure for the CLIC Test Facility (CTF 3) Drive Beam

G. Carron, E. Jensen, M. Luong, A. Millich, E. Rugo, I. Syratchev, L. Thorndahl

摘要:

对于CLIC双束方案,需要高电流、长脉冲驱动束来产生RF功率。利用3 GHz速调管可在LEP注入器一旦LEP停止,一个180 MeV的电子加速器正在建设的标称束流为3.5 A和1.5微秒脉冲长度。高电流需要高效抑制偶极尾流。本文提出了两种加速结构的设计方案:一种是为CLIC主梁设计的“锥形阻尼结构”,另一种是“狭缝光阑-恒定孔径”结构。两者都使用每个单元4个SiC负载以实现有效的高阶模式阻尼。TDS结构的全尺寸原型已经建成,并在全功率下成功测试。目前正在建造中美洲一体化体系结构的第一个原型。

英文摘要:

For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being constructed for a nominal beam current of 3.5 A and 1.5 microsecond pulse length. The high current requires highly effective suppression of dipolar wakes. Two concepts are investigated for the accelerating structure design: the "Tapered Damped Structure" developed for the CLIC main beam, and the "Slotted Iris - Constant Aperture" structure. Both use 4 SiC loads per cell for effective higher-order mode damping. A full-size prototype of the TDS structure has been built and tested successfully at full power. A first prototype of the SICA structure is being built.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑