arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2402.01523eess.SYcs.SY
收藏

用于提升100% IBRs渗透率电力系统短期电压安全的逆变器主动支撑技术

Active Support of Inverters for Improving Short-Term Voltage Security in 100% IBRsPenetrated Power Systems

Yinhong Lin, Bin Wang, Qinglai Guo, Haotian Zhao, Hongbin Sun

AI总结:

针对100% IBRs渗透率电力系统短路故障下电压支撑不足、IBR易脱网的问题,提出基于同步电机暂态特性模拟的控制方案、差异化FRT策略及参数优化模型,可有效提升短期电压安全。

摘要:

受能源危机与环境污染影响,电网中基于逆变器的资源(inverter-based resources, IBRs)的装机容量正快速增长,其中电网跟随控制(grid-following control, GFL)是目前应用最广泛的控制方式。与此同时,基于电网构网控制(grid-forming control, GFM)的装置已在电网中部署,为频率和电压提供主动支撑。未来GFL装置与GFM装置的组合应用将极具前景,尤其是在高渗透率或100% IBRs的电力系统中。\n当电网发生短路故障时,GFL装置的受控电流源特性会导致动态电压支撑(dynamic voltage support, DVS)不足,而GFM装置通常会降低内部电压以限制电流,因此可能出现深度电压跌落以及IBR非预期脱网的问题。此外,由于IBR的位置分散且控制策略多样,不同装置的电压支撑可能无法充分协调,不利于短期电压安全(short-term voltage security, STVS)。\n为解决该问题,本文提出了一种基于同步电机(synchronous machines, SMs)暂态特性模拟的控制方案。随后,基于GFL与GFM装置的特性差异,提出了一种新型故障穿越策略(fault ride-through strategy, FRT),并构建了多装置控制参数优化模型,以满足短期电压安全约束(short-term voltage security constraints, SVSCs)和装置容量约束。最后,针对该模型提出了一种基于解析建模的快速求解方法。\n基于双机单负荷系统、IEEE 14节点系统及其他不同规模系统的测试结果表明,所提方法能够有效增强GFL和GFM对电网电压的主动支撑能力,避免IBR的大规模脱网。

英文摘要:

Due to the energy crisis and environmental pollution, the installed capacity of inverter-based resources (IBRs) in power grids is rapidly increasing, and grid-following control (GFL) is the most prevalent at present. Meanwhile, grid-forming control-based (GFM) devices have been installed in the grid to provide active support for frequency and voltage. In the future GFL devices combined with GFM will be promising, especially in power systems with high penetration or 100% IBRs. When a short-circuit fault occurs in the grid, the controlled current source characteristic of the GFL devices leads to insufficient dynamic voltage support (DVS), while the GFM devices usually reduce the internal voltage to limit the current. Thus, deep voltage sags and undesired disconnections of IBRs may occur. Moreover, due to the dispersed locations and the control strategies' diversity of IBRs, the voltage support of different devices may not be fully coordinated, which is not conducive to short-term voltage security (STVS). To address this issue, a control scheme based on the simulation of transient characteristics of synchronous machines (SMs) is proposed. Then, a new fault ride-through strategy (FRT) is proposed based on the characteristic differences between GFL and GFM devices, and an optimization model of multi-device control parameters is formulated to meet the short-term voltage security constraints (SVSCs) and device capacity constraints. Finally, a fast solution method based on analytical modeling is proposed for the model. Test results based on the doublegenerator-one-load system, the IEEE 14-bus system, and other systems of different sizes show that the proposed method can effectively enhance the active support capability of GFL and GFM to the grid voltage, and avoid the large-scale disconnection of IBRs

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑