CEPC概念设计报告:第1卷-加速器

CEPC Conceptual Design Report: Volume 1 - Accelerator

The CEPC Study Group

摘要:

环形正负电子对撞机(CEPC)是由中国发起并主持的大型国际科学工程。它位于一个周长100公里的地下隧道中。加速器复合体由一个直线加速器(Linac)、一个阻尼环(DR)、助推器、对撞机和几条传输线组成。在隧道中,为未来的pp对撞机SPPC预留了空间。CEPC的质心能量是240 GeV,在这个碰撞能量下,它将成为希格斯工厂。该设计还允许Z工厂在91 GeV下运行,W工厂在160 GeV下运行。CEPC的核心是一个双环对撞机。它有两个相互作用点,位于大型探测器。助推器在对撞机上方的同一个隧道里它是一个同步加速器,注入能量为10 GeV,引出能量等于光束碰撞能量。重复周期为10秒。将使用顶注来保持恒定的光度。10 GeV的直线加速器,助推器的注入器,建在地面,加速电子和正电子。一个1.1 GeV的阻尼环降低了正电子发射率。由永磁体制成的传输线将直线加速器连接到助推器。除了粒子物理学,对撞机可以同时作为一个强大的同步辐射(SR)光源。它将把可用的SR光谱扩展到前所未有的能量和亮度范围。设计中包括两条伽马射线束线。在建设之前,将有一个为期五年的研发期(2018-2022年)。建设预计将于2022年开始,2030年完成。这份报告是国内外数百名科学家和工程师在过去几年中所做工作的总结。当前卷,卷I,在加速器上。一个单独的卷,第二卷,将在物理和探测器。

英文摘要:

The Circular Electron Positron Collider (CEPC) is a large international scientific project initiated and hosted by China. It is located in a 100-km circumference underground tunnel. The accelerator complex consists of a linear accelerator (Linac), a damping ring (DR), the Booster, the Collider and several transport lines. In the tunnel, space is reserved for a future pp collider, SPPC. The CEPC center-of-mass energy is 240 GeV, and at that collision energy will serve as a Higgs factory. The design also allows operation at 91 GeV for a Z factory and at 160 GeV for a W factory. The heart of the CEPC is a double-ring collider. It has two interaction points where are located large detectors. The Booster is in the same tunnel above the Collider. It is a synchrotron with a 10 GeV injection energy and extraction energy equal to the beam collision energy. The repetition cycle is 10 seconds. Top-up injection will be used to maintain constant luminosity. The 10 GeV Linac, injector to the Booster, built at ground level, accelerates both electrons and positrons. A 1.1 GeV damping ring reduces the positron emittance. Transport lines made of permanent magnets connect the Linac to the Booster. In addition to particle physics, the Collider can operate simultaneously as a powerful synchrotron radiation (SR) light source. It will extend the usable SR spectrum into an unprecedented energy and brightness range. Two gamma-ray beamlines are included in the design. Prior to the construction will be a five-year R&D period (2018-2022). Construction is expected to start in ~2022 and be completed in ~2030. This report is a summary of work accomplished during the past several years by hundreds of scientists and engineers at home and abroad. The current volume, Volume I, is on the accelerators. A separate volume, Volume II, will be on physics and the detectors.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑