The J-PARC linac was consist of 324MHz low-β section and 972MHz high-β section. There is a total of 48 stations. And each station was equipped with an independent LLRF (Low-Level Radio Frequency) system to realize an accelerating field stability of $\pm1$% in amplitude and $\pm1$° in phase. For these llrf system, some of them, especially the 324MHz low-β section, had already been used for more than 10 years. Due to lack of supply, it had become more and more difficult to do the system maintain. And in the near future, the beam current of j-parc linac was planned to increase to 60mA. At that time, the current system will face a huge pressure in solving the beam loading effect. Considering these, a new digital llrf system was developing at j-parc linac. In this paper, the architecture of the new system will be reported. The performance of system with a test cavity is summarized.
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton source through 2025. The first phase of the PIP will enable the Fermilab proton source to deliver 1.8e17 protons per hour by mid-2013. As part of this initial upgrade, Fermilab plans to install a new front-end consisting of dual H- ion sources and a 201 MHz pulsed RFQ. This paper will present beam studies measurements of this new front-end and discuss new beam…
This Document contains a complete technical description of the system devoted to the upgrade of the STAR Linear Accelerator (STAR Linac). According to the Contract signed between Universita della Calabria (UniCal) and Istituto Nazionale di Fisica Nucleare (INFN) on May 7th, 2021, INFN is committed to install, test and commission the upgrade of the STAR Linac denominated STAR-HE-Linac (STAR High Energy Linac), hereafter STAR-HEL. The technical components as well as the installation / test procedures and the ancillary equipment involved in such an upgrade are the object of this Document, named C…
J-PARC neutrino beamline has been operated since 2009. Until May 2018, the maximum beam power achieved was ~500 kW. In future, the beam power will be upgraded to 1.3 MW. After the stable operation in late 2020s, we can accumulate ~30 x 10^20 POT data per year. It is almost the same number as total POT accumulated in recent 10 years. The upgrade plan of the Main Ring as well as the neutrino beamline is reported.
The first phase of the HIE-ISOLDE project at CERN consists of a superconducting (SC) linac upgrade in order to increase the energy of post-accelerated radioactive ion beams from 2.8 MeV/u to over 10 MeV/u (for A/q = 4.5). In preparation for the upgrade, we present beam dynamics studies of the booster section of the normal conducting (NC) REX-ISOLDE linac, focused on the longitudinal development of the beam in the 101.28 MHz Interdigital H-mode Structure (IHS), employing a Combined Zero Degree Structure (KONUS), pulsing at a high gradient of over 3 MV/m. The evolution of the transverse emittanc…
Upgrades to the J-PARC accelerators and the neutrino experimental facility are of vital importance to the Tokai to Hyper-Kamiokande project (T2HK), which aims to explore CP asymmetry by the $ν_e$ appearance. In this talk I present overview of the T2HK project, current status of the beam operation at J-PARC, and prospect to realize the rated 750 kW operation in coming years.
Japan Proton Accelerator Research Complex (J-PARC) aims at a MW-class proton accelerator facility. One of the promising solutions for increasing the beam power of the Main Ring (MR) is converters of the main magnets with new ones for this upgrade. We have a plan to replace and develop the power converters of main magnets for this upgrade. According to develop the new power converter. We have developed a new control system for the new power converters. This control system consists of four parts : the current measuring device, the feedback control system, the gate pulse generator and the slow co…
In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector accelerators, namely, the current 400 MeV LINAC and the Booster, are in progress under the Proton Improvement Plan (PIP). Proton Improvement Plan-II (PIP-II) proposes to replace the existing 400 MeV LINAC by a new 800 MeV LINAC, as an injector to the Booster which will increase Booster output power by nearly a factor of two from the PIP design value by the end of…
In the framework of the upgrade of the SPARC_LAB facility at INFN-LNF, named EuPRAXIA@SPARC_LAB, a high gradient linac is foreseen. One of the most suitable options is to realize it in X-band. A preliminary design study of both accelerating structures and power distribution system has been performed. It is based on 0.5 m long travelling wave (TW) accelerating structures operating in the 2π/3 mode and fed by klystrons and pulse compressor systems. The main parameters of the structures and linac are presented with the basic RF linac layout.
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and the present status of the LLRF system for this project.
At the Ibaraki Neutron Medical Research Center, an accelerator-based neutron source for iBNCT (Ibaraki - Boron Neutron Capture Therapy) is being developed using an 8-MeV proton linac and a beryllium-based neutron production target. The proton linac consists of an RFQ and a DTL, which is almost the same as the front part of J-PARC linac. However, here only one high-power klystron is used as the RF source to drive the two cavities, which have quite different Q-values and responses. From June 2016, a cPCI based digital feedback system was applied to the iBNCT accelerator. It serves not only as a …
SLAC National Accelerator Laboratory is collaborating with Arizona State University to design a LLRF system towards the advancement of the ASU Compact X-ray Light Source (CXLS). The CXLS is a phased project to develop small brilliant x-ray sources that may produce coherent x-rays appropriate as a seed source for LCLS and LCLS II. The CXLS electron beam is produced by an x-band photoinjector and linac operating at 9.3 GHz RF frequency and 1 kHz repetition rate with up to 300 pC per bunch. The linac consists of 3 short 20-cell sections of standing wave linac. The RF gun and linac sections are po…
Suppression of beam losses is essential for successful operation of high-intensity linac. Historically, the values of the field amplitudes and phases of the side-coupled, 805-MHz LANSCE linac modules are maintained using a well-known delta-t tuning procedure. Transverse matching of the beam with accelerator is performed through adjustments of beam ellipses in 4D phase space with accelerator lattice using matching quadrupoles. Control of the beam-energy ramp along the length of a proton linear accelerator is required to improve tune of accelerator and decrease beam losses. Time-of-flight measur…
LCLS-II is currently in its commissioning phase at SLAC. It is an X-ray FEL driven by a CW superconducting LINAC. The beam injector plays a crucial role in the overall performance of the accelerator, and is critical to the final electron beam performance parameters. The LCLS-II injector comprises of a 185.7 MHz VHF copper gun cavity, and a 1.3 GHz two-cell L-band copper buncher cavity. The FPGA-based controller employs feedback and Self-Excited Loop logic in order to regulate the cavity fields. It also features several other functionalities, such as live detune computation, active frequency tr…
The upgrade of the ISOLDE machine at CERN foresees a superconducting linac based on two gap independently phased Nb sputtered Quarter Wave Resonators (QWRs) working at 101.28MHz and producing an accelerating field of 6MV/m on axis. A careful study of the fields in the cavity has been carried out in order to pin down the crucial e-m parameters of the structure such as peak fields, quality factor and e-m power dissipated on the cavity wall. A tuning system with about 200kHz frequency range has been developed in order to cope with fabrication tolerances. In this paper we will report on the cavity…