arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1710.04490cs.FL
收藏

Buechi下推自动机的平均栈代价

Average Stack Cost of Buechi Pushdown Automata

Jakub Michaliszyn, Jan Otop

摘要:

研究了Buechi下推自动机(Buechi PDA)的平均栈代价.我们将非负价格与每个堆栈符号相关联,并将堆栈的成本定义为所有元素的成本之和。我们介绍和研究的平均堆栈成本问题(ASC),它问是否存在一个接受运行的一个给定的Buechi PDA,使长期运行的平均堆栈成本低于一些给定的阈值。ASC问题推广了均值-收益目标,可以用来表达下推系统的定量性质。特别地,我们可以使用ASC问题计算平均响应时间。我们证明了ASC问题可以在多项式时间内求解。

英文摘要:

We study the average stack cost of Buechi pushdown automata (Buechi PDA). We associate a non-negative price with each stack symbol and define the cost of a stack as the sum of costs of all its elements. We introduce and study the average stack cost problem (ASC), which asks whether there exists an accepting run of a given Buechi PDA such that the long-run average of stack costs is below some given threshold. The ASC problem generalizes mean-payoff objective and can be used to express quantitative properties of pushdown systems. In particular, we can compute the average response time using the ASC problem. We show that the ASC problem can be solved in polynomial time.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑