In this paper we show how a deep-submicron FPGA can be modified to operate at extremely low temperatures through modifications in the supporting hardware and in the firmware programming it. Though FPGAs are not designed to operate at a few Kelvin, it is possible to do so on virtue of the extremely high doping levels found in deep-submicron CMOS technology nodes. First, any PCB component, that does not conform with this requirement, is removed. Both the majority of decoupling capacitor types and voltage regulators are not well behaved at cryogenic temperatures, asking for an ad-hoc solution to stabilize the FPGA supply voltage, especially for sensitive applications. Therefore, we have designed a firmware that enforces a constant power consumption, so as to stabilize the supply voltage in the interior of the FPGA chip. The FPGA is powered with a supply at several meters distance, causing significant IR drop and thus fluctuations on the local supply voltage. To achieve the stabilization, the variation in digital logic speed, which directly corresponds to changes in supply voltage, is constantly measured and corrected for through a tunable oscillator farm, implemented on the FPGA. The method is versatile and robust, enabling seamless porting to other FPGA families and configurations.
Low Latency Neural Networks using Heterogenous Resources on FPGA for the Belle II Trigger
Belle II触发系统的主要组成部分之一是神经网络触发器。它的任务是估计在实验漂移室中观察到的z-顶点粒子径迹。触发器在FPGA上实现,以确保操作期间的灵活性并利用其IO功能。同时,实现必须在几百纳秒内估计顶点以满足实验的要求。在第一次碰撞期间,该触发器的第一个版本是可操作的。虽然它能够估计顶点,但它在可能的吞吐量和时序收敛方面存在一些缺点。这些都是这项工作的重点,它修改了原来的设计,允许两个网络并行运行,减少路由拥塞。我们进行了重调度的乘法和累加,这是在这样的网络中的基本操作。原设计试图尽可能多地并行化,而重调度则试图通过重用处理模块来减少并行数据传输的数量。这样,DSP的资源消耗减少了40%。为了通过并行操作额外的网络来进一步提高吞吐量,我们研究了用于乘法和累加操作的SRAM-LUT和DSP的平衡使用。利用找到的平衡比率,触发器能够在所需的延迟内在目标FPGA上并行操作两个神经网络。
Operation and performance of the ICARUS-T600 cryogenic plant at Gran Sasso underground Laboratory
ICARUS T600液氩时间投影室是新一代的第一个大质量电子探测器,它能够将旧泡室的成像能力与出色的量热能量测量相结合。2001年在帕维亚进行了三个月的地面示范运行后,T600低温工厂在可靠性和安全性方面进行了重大修改,考虑到其在地下环境中的长期运行。T600探测器于2010年春季在INFN Gran Sasso实验室的B厅启动,在那里不间断地运行了大约三年,将暴露于欧洲核子研究中心的数据带到Gran Sasso长基线中微子束和宇宙射线。本文详细介绍了T600低温装置以及在液态氩填充结束后不久成功运行探测器的调试程序。讨论了长期地下运行期间的总体电厂性能和稳定性。最后,退役程序,进行了约6个月后,CNGS中微子束操作结束,报告。