The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed processing not only on multiple machines, but on multiple clusters. We consider a scheduling problem to minimize weighted average completion time of N jobs on M distributed clusters of parallel machines. In keeping with the scale of the problems motivating this work, we assume that (1) each job is divided into M "subjobs" and (2) distinct subjobs of a given job may be processed concurrently.
When each cluster is a single machine, this is the NP-Hard concurrent open shop problem. A clear limitation of such a model is that a serial processing assumption sidesteps the issue of how different tasks of a given subjob might be processed in parallel. Our algorithms explicitly model clusters as pools of resources and effectively overcome this issue.
Under a variety of parameter settings, we develop two constant factor approximation algorithms for this problem. The first algorithm uses an LP relaxation tailored to this problem from prior work. This LP-based algorithm provides strong performance guarantees. Our second algorithm exploits a surprisingly simple mapping to the special case of one machine per cluster. This mapping-based algorithm is combinatorial and extremely fast. These are the first constant factor approximations for this problem.
Online Primal-Dual Algorithms with Predictions for Packing Problems
University Paris-Saclay(巴黎萨克雷大学);Sorbonne University(巴黎索邦大学);IBISC(IBISC(需注意:IBISC是巴黎萨克雷大学下属研究机构,此处按原文提取));CNRS(法国国家科学研究中心);LIP6(LIP6(巴黎索邦大学下属实验室,此处按原文提取))
Improved approximation schemes for early work scheduling on identical parallel machines with common due date
本文研究了以最大化总提前工作量为目标的同类平行机提前工作排序问题,在一个共同的到期日之前执行的非抢占式作业的部分。通过预处理和构造具有多个良好性质的辅助实例,我们提出了一种高效的具有运行时间的多项式时间逼近方案$O(n)$,改进了[Györgyi,P.,Kis,T.(2020年)。早期工作、后期工作和资源均衡问题的通用近似框架。{ \it European Journal of Operational Research},286(1),129-137],以及当机器的数量是固定数量时具有运行时间的完全多项式时间近似方案$O(n)$,其改进了[Chen,X.,梁玉,Sterna,M.,王伟,Baewicz,J.(2020 b)。在具有共同交货期的并行机上最大化早期工作的全多项式时间近似方案。{ \it European Journal of Operational Research},284(1),67-74],其中$n$是作业的数量,隐藏常数取决于所需的精度。
Efficient Approximation Algorithms for Scheduling Coflows with Precedence Constraints in Identical Parallel Networks to Minimize Weighted Completion Time
A Note on NP-Hardness of Preemptive Mean Flow-Time Scheduling for Parallel Machines
Baptiste,Brucker,Chrobak,Dürr,Kravchenko和Sourd在论文“The complex of mean flow time scheduling problems with release times”中,证明了调度问题$P|pmtn,r_j|\sum C_j$的强NP-困难性,即以最小化平均流时间为目标的多处理器抢占式调度。指出了他们证明中的一个严重错误,并给出了该问题强NP-困难性的一个新证明。