arXivDaily arXiv每日学术速递 周一至周五更新
arXiv周末暂无论文更新,休息一下吧,周末愉快~~
arXiv 1507.01167math.OCcs.SYeess.SY
收藏

不确定性、发电备用和传输备用的市场出清——第二部分:案例研究

Market Clearing for Uncertainty, Generation Reserve, and Transmission Reserve--Part II:Case Study

Hongxing Ye, Yinyin Ge, Mohammad Shahidehpour, Zuyi Li

AI总结:

本文基于不确定性、发电备用和传输备用的市场出清问题,通过鲁棒优化框架分析边际价格,并探讨传统备用价格与UMP的对比及市场参与者激励。

摘要:

在本文第二部分中,我们基于第一部分得出的边际价格,在鲁棒优化框架下进行分析。负荷和发电按局部边际价格(LMP)定价,而不确定性和发电备用按不确定性边际价格(UMP)定价。当存在传输备用时,展示了金融传输权利(FTR)的不足。比较了传统备用价格与UMP,并讨论了新市场方案中市场参与者的激励。

英文摘要:

In Part II of this two-part paper, we analyze the marginal prices derived in Part I of this two-part paper within a robust optimization framework. The load and generation are priced at Locational Marginal Price (LMP) while the uncertainty and generation reserve are priced at Uncertainty Marginal Price(UMP). The Financial Transmission Right (FTR) underfunding is demonstrated when there is transmission reserve. A comparison between traditional reserve price and UMP is presented. We also discuss the incentives for market participants within the new market scheme.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑