arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 0707.4600math.PR
收藏

具有软截止期的处理器共享队列的高负荷服务限制

Heavy traffic limit for a processor sharing queue with soft deadlines

H. Christian Gromoll, Łukasz Kruk

摘要:

本文研究了一个GI/GI/1处理机共享队列,其中的作业具有软截止期。在每个时间点,剩余的服务时间和最后期限的收集建模使用右半平面上的随机计数措施。在扩散标度和高负荷服务条件下得到了该测度值过程的极限,并刻画为极限队列长度过程的确定性函数.作为特殊情况,得到了提前时间曲线和排队时间曲线的扩散近似。还得到了逗留时间的快拍原理。

英文摘要:

This paper considers a GI/GI/1 processor sharing queue in which jobs have soft deadlines. At each point in time, the collection of residual service times and deadlines is modeled using a random counting measure on the right half-plane. The limit of this measure valued process is obtained under diffusion scaling and heavy traffic conditions and is characterized as a deterministic function of the limiting queue length process. As special cases, one obtains diffusion approximations for the lead time profile and the profile of times in queue. One also obtains a snapshot principle for sojourn times.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑