arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2607.04564eess.SYcs.SY
收藏

作为虚拟存储的大负荷需求灵活性

Large-Load Demand Flexibility as Virtual Storage

Michigan State University(密歇根州立大学)

Chandan Chaudhary, Mohammed Ben-Idris, Joydeep Mitra

AI总结:

研究水电解厂等大负荷需求灵活性与电池储能系统联合采购价值未实现问题,通过虚拟存储等价建立联系,给出联合调度方法,验证表明虚拟存储可实现大部分联合采购节省。

摘要:

水电解厂、超大规模数据中心和铝冶炼生产线代表着用于电力系统平衡、运营规划和采购服务的数吉瓦需求侧灵活性。此类负荷通过每间隔功率界限和时域能量窗口进行调度,而共址电池储能系统(BESS)则根据荷电状态动态运行。这两种表述没有共同的数学结构,因此共址负荷和储能的联合采购价值无法实现。本文通过虚拟存储(VS)等价建立了这两种表述之间的联系。在电网功率平衡中,在功率界限和能量窗口约束下的每一个可行大负荷轨迹都是一个以单位核算效率运行的VS设备的有效充电轨迹。生产和服务层面的成本不在此抽象范围内,而是通过削减机会成本进入调度。对于与BESS共址的组合,聚合将约束数量从O(NT)减少到O(T),并为两种资源产生联合调度价格。在具有三种代表性负荷类别的IEEE RTS-GMLC上的验证表明,虚拟存储实现了联合采购节省的主要部分。在测试案例中,节省是可加的,因为两种资源调度到不重叠的时间段,并且削减影子价格跟踪峰值价格带的起始点而不是每日峰值价格。

英文摘要:

Water electrolysis plants, hyperscale data centers, and aluminum potlines represent gigawatts of demand-side flexibility for bulk power system balancing, operational planning, and procurement services. Such loads are scheduled through per-interval power bounds and horizon energy windows, whereas co-located battery energy storage systems (BESS) operate under state-of-charge dynamics. The two formulations share no common mathematical structure, and the joint procurement value of co-located loads and storage goes unrealized as a result. This paper establishes the connection between the two formulations through a virtual storage (VS) equivalence. Every feasible large-load trajectory under power-bound and energy-window constraints is a valid charge trajectory of a VS device that operates at unity accounting efficiency in the grid power balance. Production and service-level costs lie outside this abstraction and enter the dispatch through curtailment opportunity costs. For a portfolio co-located with a BESS, aggregation reduces the constraint count from O(NT) to O(T) and yields a co-dispatch price for both resources. Validation on the IEEE RTS-GMLC with three representative load classes shows that virtual storage delivers the dominant share of joint procurement savings. In the tested case, savings are additive because the two resources dispatch to non-overlapping intervals, and the curtailment shadow price tracks the peak-price band onset rather than the daily peak price.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑