arXivDaily arXiv每日学术速递 周一至周五更新
arXiv周末暂无论文更新,休息一下吧,周末愉快~~
arXiv 2607.01966cs.LG
收藏

基于时间序列基础模型的概率低压峰值负荷预测及其面向应用的评估指标

Probabilistic Low-Voltage Peak Load Forecasting with Time Series Foundation Models Evaluated on Application-Oriented Metrics

Karlsruhe Institute of Technology (KIT)(卡尔斯鲁厄理工学院);Netze BW GmbH(Netze BW有限公司)

Benedikt Kaas, Manuel Treutlein, Hannes Benedikt Gerber, Oliver Neumann, Cheewan Phatthanakhuha, Oliver Resch, Ralf Mikut, Veit Hagenmeyer

AI总结:

本研究评估时间序列基础模型在200个实际低压馈线短期净负荷预测中的性能,提出面向应用的指标连接峰值预测与电网资产规划中的成本-风险权衡。

摘要:

低压负荷预测在当前和未来高电气化与分布式发电的能源系统中是一个重要组成部分。然而,当前的预测方法需要大量人工干预,通常缺乏不确定性估计和适当的峰值预测,并且往往没有根据电网需求进行充分评估。在本研究中,我们对200个实际低压馈线的短期净负荷预测进行了广泛评估,重点关注快速发展的时序基础模型。我们的研究将Chronos-Bolt、Chronos-2和TabPFN-TS与六个基线模型进行比较,并展示了其优越性能,尤其是Chronos-2。一项省略天气协变量的消融研究表明,尽管天气信息很重要,但时间序列基础模型能够适应增加的不确定性。一种新颖的面向应用指标将模型在峰值预测中的能力与电网资产规划和运营中成本降低与故障风险最小化之间的权衡联系起来。

英文摘要:

Low-voltage load forecasting is an important component in current and future energy systems with a high degree of electrification and decentralized generation. However, current forecasting methods require significant manual effort, often lack uncertainty estimation and proper peak prediction, and they are often not adequately evaluated in terms of grid requirements. In the present study, we provide an extensive evaluation of short-term net load forecasts of 200 real-world low-voltage feeders with a focus on the rapidly evolving time series foundation models. Our study compares Chronos-Bolt, Chronos-2 and TabPFN-TS to six baseline models and demonstrates superior performance, in particular for Chronos-2. An ablation study, in which weather covariates are omitted, shows that time series foundation models adapt to increased uncertainty, despite the importance of weather information. A novel application-oriented metric links the model's forecasting capabilities in peak prediction to the trade-off in grid asset planning and operation between cost reduction and minimizing the risk of failure.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑