arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2603.00514math.OCcs.SYeess.SY
收藏

增强型氢电解装置集成储能以提供电网形成服务用于无电网制氢应用

Enhanced Hydrogen Electrolyzer with Integrated Energy Storage to Provide Grid-Forming Services for Off-Grid ReP2H Application

College of Electrical Engineering, Sichuan University(四川大学电气工程学院)

Yiwei Qiu, Jiahao Hu, Yi Zhou, Jie Zhu, Li Jiang, Shi Chen, Buxiang Zhou

AI总结:

本文提出了一种集成储能的增强型氢电解装置,通过虚拟同步机控制和协调频率分割策略,提升能源效率并降低投资成本,为无电网制氢系统提供电网形成服务。

摘要:

本文提出了一种增强型氢电解装置(ESEHE),用于为无电网可再生能源到氢能(ReP2H)系统提供电网形成(GFM)服务。与传统的ReP2H系统不同,该拓扑结构直接将电池连接到电解堆整流器的直流总线。定制的虚拟同步机(VSM)控制框架使电解装置能够自主提供有功和无功功率支持。设计了一种协调频率分割能量提取策略,以利用电池和电解堆的电双层(EDL)效应在不同时间尺度上,最大化有功功率支持同时减轻电池和堆的退化。进一步开发了自适应均衡控制策略,以平衡多个并行运行的ESEHEs的电池荷电状态(SOC),这优化了能量分配并延长了电池寿命。在StarSim上的实时模拟验证了所提拓扑结构和控制策略。技术经济分析显示,与基于集中式储能(ES)工厂的传统无电网ReP2H系统相比,ESEHE提高了整体能源效率0.23%,并将初始总整流器投资成本降低了约6%,主要是由于消除了双向AC/DC转换及其相关的损耗。

英文摘要:

This article proposes an energy storage-enhanced hydrogen electrolyzer (ESEHE) to provide grid-forming (GFM) services for off-grid renewable power to hydrogen (ReP2H) systems. Unlike conventional ReP2H systems that use a centralized energy storage (ES) plant, the proposed topology directly connects batteries to the DC buses of electrolysis rectifiers. A tailored virtual synchronous machine (VSM) control framework enables the electrolyzer to autonomously provide real and reactive power support. A coordinated frequency-splitting energy extraction strategy is designed to exploit both the battery and the electrolysis stack's electrical double-layer (EDL) effect on different timescales, maximizing active power support while mitigating battery and stack degradation. An adaptive equalization control strategy is further developed to balance the battery state of charge (SOC) among multiple ESEHEs operating in parallel, which optimizes energy distribution and extends battery life. Real-time simulations on StarSim validate the proposed topology and control strategies. Techno-economic analysis shows that, compared with conventional off-grid ReP2H systems based on a centralized ES plant, the ESEHE improves overall energy efficiency by 0.23% and reduces the initial total converter investment cost by roughly 6%, mainly due to the elimination of bidirectional AC/DC conversion and its associated losses in the centralized ES plant.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑