具有实周期的风车调度

Pinwheel Scheduling with Real Periods

Shinshu University(信州大学);The University of Electro-Communications(电气通信大学)

Hiroshi Fujiwara, Kota Miyagi, Katsuhisa Ouchi

AI总结:

研究具有实周期的风车调度问题,针对周期取三个不同实值且密度至多为\(\frac{5}{6}\)的任务序列,证明其存在有效调度,还猜测Chan和Chin的猜想对实周期也成立。

摘要:

对于每个具有正整数周期的任务序列,风车调度问题是找到一个有效调度,即每天执行一个任务且每个任务在其周期的连续天数内至少执行一次。Chan和Chin曾猜想密度(各周期倒数之和)至多为\(\frac{5}{6}\)的任何任务序列都存在有效调度,Kawamura最近肯定地解决了该猜想。本文考虑Kawamura提出的具有实周期的扩展版本,证明了周期取三个不同实值且密度至多为\(\frac{5}{6}\)的任何任务序列都有有效调度,并猜测Chan和Chin的猜想对实周期也成立。

英文摘要:

For a sequence of tasks, each with a positive integer period, the pinwheel scheduling problem involves finding a valid schedule in the sense that the schedule performs one task per day and each task is performed at least once every consecutive days of its period. It had been conjectured by Chan and Chin (1993) that there exists a valid schedule for any sequence of tasks with density, the sum of the reciprocals of each period, at most $\frac{5}{6}$. Recently, Kawamura (2024, in press) settled this conjecture affirmatively. In this paper we consider an extended version with real periods proposed by Kawamura, in which a valid schedule must perform each task $i$ having a real period~$a_{i}$ at least $l$ times in any $\lceil l a_{i} \rceil$ consecutive days for all positive integer $l$. We show that any sequence of tasks such that the periods take three distinct real values and the density is at most $\frac{5}{6}$ admits a valid schedule. We hereby conjecture that the conjecture of Chan and Chin is true also for real periods.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑