Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period
摘要:
研究了在容量受限的网络中,以最大化从源节点到汇聚节点的总流量为目标的弧段维护调度问题。对电弧的维护在其维护被调度的时段的持续时间内关闭电弧,使得其容量在该时段为零。一组弧被指定在规划期间进行维护,这将要求每个弧关闭一段时间。在一般情况下,这个问题被称为是NP难的,和几个特殊的实例类已经研究。在这里,我们提出了一个额外的约束,限制了每个时间段的维护工作的数量,我们研究了这对复杂性的影响。
英文摘要:
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard, and several special instance classes have been studied. Here we propose an additional constraint which limits the number of maintenance jobs per time period, and we study the impact of this on the complexity.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。