arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2310.04857cs.NIcs.SYeess.SY
收藏

空中基站:功耗与服务时长的实际考量

Aerial Base Stations: Practical Considerations for Power Consumption and Service Time

Siva Satya Sri Ganesh Seeram, Shuai Zhang, Mustafa Ozger, Andre Grabs, Jaroslav Holis, Cicek Cavdar

AI总结:

该研究针对空中基站实际部署中的有限载荷与机载能源问题,分析三类平台的能耗模型与性能指标,并结合旋翼无人机基站案例评估网络规划维度,为相关成本规划提供参考。

摘要:

空中基站(ABSs)已成为满足未来无线网络高流量需求的一种颇具前景的解决方案。然而,其实际部署需要高效利用有限的有效载荷和机载能源。了解机械功耗、通信功耗等各类功耗流及其与有效载荷的关系,对分析其可行性至关重要。具体而言,我们聚焦旋翼无人机(RWDs)、固定翼无人机(FWDs)和高空平台(HAPs),分析其能耗模型及关键性能指标,包括功耗、能量收集消耗比、不同翼展、电池容量和部署区域下的服务时长。研究结果表明,固定翼无人机的服务时长更长,高空平台的能量收集消耗比大于1,意味着理论上可实现无限服务时长,在部署于近赤道区域或翼展较大时尤为明显。此外,我们研究了旋翼无人机基站部署的案例,评估了空中网络规划相关维度,例如基于高度、环境和工作频率的空中基站覆盖半径。我们的研究结果为研究人员和电信运营商提供了宝贵参考,可通过确定不间断运营所需的空中基站数量和备用电池数量,助力开展有效的成本规划。

英文摘要:

Aerial base stations (ABSs) have emerged as a promising solution to meet the high traffic demands of future wireless networks. Nevertheless, their practical implementation requires efficient utilization of limited payload and onboard energy. Understanding the power consumption streams, such as mechanical and communication power, and their relationship to the payload is crucial for analyzing its feasibility. Specifically, we focus on rotary-wing drones (RWDs), fixed-wing drones (FWDs), and high-altitude platforms (HAPs), analyzing their energy consumption models and key performance metrics such as power consumption, energy harvested-to-consumption ratio, and service time with varying wingspans, battery capacities, and regions. Our findings indicate that FWDs have longer service times and HAPs have energy harvested-to-consumption ratios greater than one, indicating theoretically infinite service time, especially when deployed in near-equator regions or have a large wingspan. Additionally, we investigate the case study of RWD-BS deployment, assessing aerial network dimensioning aspects such as ABS coverage radius based on altitude, environment, and frequency of operation. Our findings provide valuable insights for researchers and telecom operators, facilitating effective cost planning by determining the number of ABSs and backup batteries required for uninterrupted operations.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑