arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2309.09763cs.NIcs.ETcs.NAcs.PFmath.NA
收藏

面向时延敏感型B5G的近最优云网一体化资源分配

Near-optimal Cloud-Network Integrated Resource Allocation for Latency-Sensitive B5G

Masoud Shokrnezhad, Tarik Taleb

AI总结:

本文针对时延敏感型B5G场景,提出云网一体化通信与计算资源联合分配问题CCRA,并设计基于分支定界和注水算法的B&B-CCRA与WF-CCRA两种方法,在保证QoS的同时最小化总体成本,实现最优与近最优的高效资源分配。

摘要:

如今,在容量需求持续扩张的同时,万物互联的蓬勃发展正在带来通信网络认知方式的范式转变,催生了大量全新独特的服务。为了提供这些服务,必须建立虚拟网络功能(VNF)并使其能够被终端用户访问,这将产生和消耗海量数据,而这些数据必须在本地处理以保证服务响应能力和可扩展性。要实现这一目标,坚实的云网一体化基础设施是必要条件,并且由于云域和网络域在特性上具有多样性而在能力上存在局限性,通信资源和计算资源应当被联合管控以释放其全部潜力。尽管已有多种创新方法被提出用于资源分配,但其中大多数要么忽略了网络资源,要么将网络简化为简单图,这些方法不适用于Beyond 5G,因为B5G具有动态性和严格的QoS要求。本文通过研究通信与计算资源分配的联合问题(称为CCRA)来填补这一空白,该问题包括VNF放置与分配、流量优先级划分以及路径选择,同时考虑容量约束以及链路时延和排队时延,目标是最小化总体成本。我们将该问题建模为一个非线性规划模型,并分别基于分支定界算法和注水算法提出了两种方法,称为B&B-CCRA和WF-CCRA。数值仿真表明,B&B-CCRA能够最优地求解该问题,而WF-CCRA能够在显著更短的时间内提供近最优解。

英文摘要:

Nowadays, while the demand for capacity continues to expand, the blossoming of Internet of Everything is bringing in a paradigm shift to new perceptions of communication networks, ushering in a plethora of totally unique services. To provide these services, Virtual Network Functions (VNFs) must be established and reachable by end-users, which will generate and consume massive volumes of data that must be processed locally for service responsiveness and scalability. For this to be realized, a solid cloud-network Integrated infrastructure is a necessity, and since cloud and network domains would be diverse in terms of characteristics but limited in terms of capability, communication and computing resources should be jointly controlled to unleash its full potential. Although several innovative methods have been proposed to allocate the resources, most of them either ignored network resources or relaxed the network as a simple graph, which are not applicable to Beyond 5G because of its dynamism and stringent QoS requirements. This paper fills in the gap by studying the joint problem of communication and computing resource allocation, dubbed CCRA, including VNF placement and assignment, traffic prioritization, and path selection considering capacity constraints as well as link and queuing delays, with the goal of minimizing overall cost. We formulate the problem as a non-linear programming model, and propose two approaches, dubbed B\&B-CCRA and WF-CCRA respectively, based on the Branch \& Bound and Water-Filling algorithms. Numerical simulations show that B\&B-CCRA can solve the problem optimally, whereas WF-CCRA can provide near-optimal solutions in significantly less time.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑