arXiv 2309.03380eess.SYcs.SY

从动态负荷改变攻击中恢复网络:连接电力、交通与网络

Cyber Recovery from Dynamic Load Altering Attacks: Linking Electricity, Transportation, and Cyber Networks

Mengxiang Liu, Zhongda Chu, Fei Teng

AI总结:

本文首次研究动态负荷改变攻击下的网络恢复(CRDA),通过优化维修人员路线移除恶意软件并自适应调整系统运行,构建MILP问题以重置下垂增益并修复受损负荷,保障系统稳定性。

摘要:

为了应对电网日益增加的脆弱性,攻击检测与影响缓解受到了广泛关注。然而,如何有效且快速地从网络攻击中恢复网络与物理网络仍不明确。在此背景下,本文首次对动态负荷改变攻击的网络恢复(CRDA)进行了研究。考虑到电力、交通与网络之间的互联,为CRDA制定了两个基本子任务:i)优化设计维修人员的路线以移除已安装的恶意软件,以及ii)自适应调整系统运行以消除缓解成本并保证稳定性。为此,基于策略性选择的采样点的灵敏度信息,通过估计多个IBR下垂增益变化下的相关特征值,获得了线性稳定性约束。此外,为获得鲁棒恢复策略,将恢复过程中对手的潜在反制措施建模为在每一步中最大化剩余受损资源的攻击影响。最终可以为CRDA构建一个混合整数线性规划(MILP)问题,其主要目标是重置相关下垂增益,其次是修复所有受损负荷。在修改后的IEEE 39节点电力系统中进行了案例研究,以说明所提CRDA与基准案例相比的有效性。

英文摘要:

To address the increasing vulnerability of power grids, significant attention has been focused on the attack detection and impact mitigation. However, it is still unclear how to effectively and quickly recover the cyber and physical networks from a cyberattack. In this context, this paper presents the first investigation of the Cyber Recovery from Dynamic load altering Attack (CRDA). Considering the interconnection among electricity, transportation, and cyber networks, two essential sub-tasks are formulated for the CRDA: i) Optimal design of repair crew routes to remove installed malware and ii) Adaptive adjustment of system operation to eliminate the mitigation costs while guaranteeing stability. To achieve this, linear stability constraints are obtained by estimating the related eigenvalues under the variation of multiple IBR droop gains based on the sensitivity information of strategically selected sampling points. Moreover, to obtain the robust recovery strategy, the potential counter-measures from the adversary during the recovery process are modeled as maximizing the attack impact of remaining compromised resources in each step. A Mixed-Integer Linear Programming (MILP) problem can be finally formulated for the CRDA with the primary objective to reset involved droop gains and secondarily to repair all compromised loads. Case studies are performed in the modified IEEE 39-bus power system to illustrate the effectiveness of the proposed CRDA compared to the benchmark case.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑